Mostrar el registro sencillo del ítem
dc.contributor.author | Martinez-Monseco, Francisco Javier | es_ES |
dc.date.accessioned | 2021-02-17T08:17:24Z | |
dc.date.available | 2021-02-17T08:17:24Z | |
dc.date.issued | 2021-01-26 | |
dc.identifier.uri | http://hdl.handle.net/10251/161621 | |
dc.description.abstract | [EN] The generation of electric energy is a continuous process of great strategic importance in the development of countries. The evolution in the last decades of different environmental control protocols at a global level has influenced the rise of renewable energies with low impact on the environment. These reasons make it important that this process has an effective maintenance management system that guarantees adequate reliability, availability and useful life of its assets. This article describes the implementation of the optimization of the traditional preventive maintenance that is carried out in regular temporary intervals with unavailability of the hydroelectric group, to be able to take advantage of the data base of operation of the group (failure modes, criticality, application of maintenance strategies to condition and maintenance 4.0, etc…). | es_ES |
dc.description.sponsorship | The author is grateful for the transmission of the best practices to the staff of the UPH Ebro Pirineos of the company Enel Green Power Hydro Iberia. Especially to Maria Soledad Ordoñez (Director UPH) and Luis Leon (Head UT Lleida) for the implementation of improvement working groups within the territorial unit. | es_ES |
dc.language | Inglés | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.relation.ispartof | Journal of Applied Research in Technology & Engineering | es_ES |
dc.rights | Reconocimiento - No comercial - Compartir igual (by-nc-sa) | es_ES |
dc.subject | Maintenance | es_ES |
dc.subject | Reliability | es_ES |
dc.subject | Power plants | es_ES |
dc.subject | Industrial processes | es_ES |
dc.title | An approach to a maintenance plan for a turbine of hydroelectric power plant. Optimisation based in RCM and FMECA analysis | es_ES |
dc.type | Artículo | es_ES |
dc.identifier.doi | 10.4995/jarte.2021.14761 | |
dc.rights.accessRights | Abierto | es_ES |
dc.description.bibliographicCitation | Martinez-Monseco, FJ. (2021). An approach to a maintenance plan for a turbine of hydroelectric power plant. Optimisation based in RCM and FMECA analysis. Journal of Applied Research in Technology & Engineering. 2(1):39-50. https://doi.org/10.4995/jarte.2021.14761 | es_ES |
dc.description.accrualMethod | OJS | es_ES |
dc.relation.publisherversion | https://doi.org/10.4995/jarte.2021.14761 | es_ES |
dc.description.upvformatpinicio | 39 | es_ES |
dc.description.upvformatpfin | 50 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 2 | es_ES |
dc.description.issue | 1 | es_ES |
dc.identifier.eissn | 2695-8821 | |
dc.relation.pasarela | OJS\14761 | es_ES |
dc.description.references | Bloom, N. (2006). Reliability Centered Maintenance (RCM): Implementation made Simple. McGraw-Hill New York. | es_ES |
dc.description.references | Calixto, E. (2016). Gas and Oil Reliability Engineering: Modelling and Analysis. Gulf Professional Publishing. https://doi.org/10.1016/B978-0-12-805427-7.00007-5 | es_ES |
dc.description.references | Egusquiza, E., Nascimento, P., Valero, C., Jou, E. (1994). Diagnóstico de daños en grupos hidroeléctricos mediante análisis de vibraciones. Revista Ingeniería del agua, 1(3), 69. https://doi.org/10.4995/ia.1994.2645 | es_ES |
dc.description.references | Garcia Illescas, R., Perez Rodriguez, N. (2007). Análisis de malfuncionamiento y de falla de una turbina hidráulica de 15 MW. X Congreso y exposición latinoamericana de maquinaria. 6-9 noviembre. Veracruz, México. 2007. | es_ES |
dc.description.references | Gulliver, J.S., Arndt, R.E. (1991). Hydropower engineering handbook. McGraw-Hill, Inc. | es_ES |
dc.description.references | Martínez Monseco, F.J. (2013). "Diseño de un plan de mantenimiento para un equipo de alta fiabilidad," Técnica Industrial, 301, 40-53. | es_ES |
dc.description.references | Martínez Monseco, F.J. (2016). Datos de la investigación y el estudio de sistemas central hidroeléctrica en desarrollo tesis doctoral en curso "Análisis y planificación del mantenimiento y explotación de una central hidroeléctrica basado en técnicas cualitativas de confiabilidad. RCM y AMFEC." Escuela de Doctorado-ETSII UNED Ingenieros Industriales, | es_ES |
dc.description.references | Martínez Monseco, F.J. (2020). Analysis of maintenance optimization in a hydroelectric power plant. Journal of Applied Research in Technology & Engineering, 1(1), 23-29. https://doi.org/10.4995/jarte.2020.13738 | es_ES |
dc.description.references | Moubray, J. (1997). Reliability-Centered Maintenance. Industrial Press Inc. | es_ES |
dc.description.references | Sifonte, J.R., Reyes-Picknell, J.V. (2017). Reliability Centered Maintenance-Reengineered: Practical Optimization of the RCM Process with RCM-R®. Productivity Press. https://doi.org/10.1201/9781315207179 | es_ES |
dc.description.references | Vargas Castillo, E., Caicedo Delgado, N.G., Ortega Henio, J.D.(2019). Método de análisis de fallos aplicado a centrales hidroelectricas. I+D Revista de investigación, 13(1), 57-72. https://doi.org/10.33304/revinv.v13n1-2019006 | es_ES |