dc.contributor.author | Sanchez, Omar | es_ES |
dc.contributor.author | Castañeda, Karen | es_ES |
dc.contributor.author | Mejía, Guillermo | es_ES |
dc.contributor.author | Pellicer, Eugenio | es_ES |
dc.date.accessioned | 2021-06-22T10:17:12Z | |
dc.date.available | 2021-06-22T10:17:12Z | |
dc.date.issued | 2020-03-10 | es_ES |
dc.identifier.isbn | 978-0-7844-8288-9 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/168229 | |
dc.description | This material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://doi.org/10.1061/9780784482889.024 | es_ES |
dc.description.abstract | [EN] Delay is one of the most common, complex and risky phenomena that adversely affects performance of construction projects. Several studies have been conducted on delay factors identification, some focused on road infrastructures, others on buildings, or on construction projects broadly. However, there are scarce publications with a comprehensive and sound analysis among projects of different type. This study presents a comparative analysis of delay factors between road infrastructure and building projects using the following research process: (1) a systematic review of articles published in specialized and peer-reviewed journals is performed; 2) relevant studies are chosen based on inclusion/exclusion criteria; (3) qualitative evidence is categorized; (4) quantitative evidence is analyzed with Spearman¿s Rank Correlation Coefficient; and (5) contributions are summarized. A final set of twenty published articles provided quantitative and qualitative evidence of construction delays. The findings indicated that delay factors identification and prioritization differs between projects and countries. Some critical delay factors for road infrastructure projects were inadequate contractor's experience and payment delays to contractor, while for building projects were shortage of materials and financial difficulties of contractor. | es_ES |
dc.language | Inglés | es_ES |
dc.publisher | American Society of Civil Engineers | es_ES |
dc.relation.ispartof | Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Construction management | es_ES |
dc.subject | Project management | es_ES |
dc.subject | Infrastructure | es_ES |
dc.subject | Project delay | es_ES |
dc.subject | Comparative studies | es_ES |
dc.subject | Infrastructure construction | es_ES |
dc.subject | Contracts and subcontracts | es_ES |
dc.subject | Highways and roads | es_ES |
dc.subject.classification | PROYECTOS DE INGENIERIA | es_ES |
dc.title | Delay Factors: A Comparative Analysis between Road Infrastructure and Building Projects | es_ES |
dc.type | Comunicación en congreso | es_ES |
dc.type | Capítulo de libro | es_ES |
dc.identifier.doi | 10.1061/9780784482889.024 | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil | es_ES |
dc.description.bibliographicCitation | Sanchez, O.; Castañeda, K.; Mejía, G.; Pellicer, E. (2020). Delay Factors: A Comparative Analysis between Road Infrastructure and Building Projects. American Society of Civil Engineers. 223-231. https://doi.org/10.1061/9780784482889.024 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.conferencename | ASCE Construction Research Congress (CRC 2020) | es_ES |
dc.relation.conferencedate | Marzo 08-10,2020 | es_ES |
dc.relation.conferenceplace | Tempe, Arizona | es_ES |
dc.relation.publisherversion | https://doi.org/10.1061/9780784482889.024 | es_ES |
dc.description.upvformatpinicio | 223 | es_ES |
dc.description.upvformatpfin | 231 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.relation.pasarela | S\422611 | es_ES |
dc.description.references | Abdellatif H. & Alshibani A. (2019). "Major factors causing delay in the delivery of manufacturing and building projects in Saudi Arabia." Buildings 9(4) 93. https://doi.org/10.3390/buildings904009310.3390/buildings9040093 | es_ES |
dc.description.references | Aibinu A. A. & Odeyinka H. A. (2006). "Construction delays and their causative factors in Nigeria." Journal of Construction Engineering and Management 132 | es_ES |
dc.description.references | (7) 667-677. https://doi.org/10.1061/(asce)0733-9364(2006)132:7(667)10.1061/(ASCE)0733-9364(2006)132:7(667) | es_ES |
dc.description.references | Akogbe R. K. T. M. Feng X. & Zhou J. (2013). "Importance and ranking evaluation of delay factors for development construction projects in Benin." KSCE Journal of Civil Engineering 17(6) 1213–1222. https://doi.org/10.1007/s12205-013-0446-210.1007/s12205-013-0446-2 | es_ES |
dc.description.references | Al-Hazim N. Salem Z. A. & Ahmad H. (2017). "Delay and cost overrun in infrastructure projects in Jordan." In Procedia Engineering(Vol. 182 pp. 18–24). The Author(s). https://doi.org/10.1016/j.proeng.2017.03.10510.1016/j.proeng.2017.03.105 | es_ES |
dc.description.references | Alaghbari W. Kadir M. R. A. Salim A. & Ernawati. (2007). "The significant factors causing delay of building construction projects in Malaysia." Engineering Construction and Architectural Management 14(2) 192–206. https://doi.org/10.1108/096999807107313010.1108/09699980710731308 | es_ES |
dc.description.references | Amoatey C. T. Ameyaw Y. A. Adaku E. & Famiyeh S. (2015). "Analysing delay causes and effects in Ghanaian state housing construction projects." International Journal of Managing Projects in Business 8(1) 198–214. https://doi.org/10.1108/IJMPB-04-2014-003510.1108/IJMPB-04-2014-0035 | es_ES |
dc.description.references | Amoatey C. T. & Okanta A. (2017). "Exploring critical road project delay factors in Ghana." Journal of Facilities Management 15(2) 110–127. Retrieved from https://doi.org/10.1108/JFM-09-2016-003610.1108/JFM-09-2016-0036 | es_ES |
dc.description.references | Aziz R. F. & Abdel-Hakam A. A. (2016). "Exploring delay causes of road construction projects in Egypt." Alexandria Engineering Journal 55(2) 1515–1539. https://doi.org/10.1016/j.aej.2016.03.00610.1016/j.aej.2016.03.006 | es_ES |
dc.description.references | Durdyev S. Omarov M. & Ismail S. (2017). "Causes of delay in residential construction projects in Cambodia." Cogent Engineering 4(1) 1–12. https://doi.org/10.1080/23311916.2017.129111710.1080/23311916.2017.1291117 | es_ES |
dc.description.references | El-Razek M. E. A. Bassioni H. A. & Mobarak A. M. (2008). "Causes of delay in building construction projects in Egypt." Journal of Construction Engineering and Management 134 | es_ES |
dc.description.references | (11) 831-841. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(831)10.1061/(ASCE)0733-9364(2008)134:11(831) | es_ES |
dc.description.references | Famiyeh S. Amoatey C. T. & Adaku E. (2017). "Major causes of construction time and cost overruns." Journal of Engineering Design and Technology 15(2) 181–198. https://doi.org/10.1108/JEDT-11-2015-007510.1108/JEDT-11-2015-0075 | es_ES |
dc.description.references | Kaliba C. Muya M. & Mumba K. (2009). "Cost escalation and schedule delays in road construction projects in Zambia." International Journal of Project Management 27(5) 522–531. https://doi.org/10.1016/j.ijproman.2008.07.00310.1016/j.ijproman.2008.07.003 | es_ES |
dc.description.references | Kaming P. F. Olomolaiye P. O. Holt G. D. & Harris F. C. (1997). "Factors influencing construction time and cost overruns on high-rise projects in Indonesia." Construction Management and Economics 1(15) 83–94. https://doi.org/10.1080/01446199737313210.1080/014461997373132 | es_ES |
dc.description.references | Khair K. Mohamed Z. Mohammad R. Farouk H. & Ahmed M. A. (2017). "A management framework to reduce delays in road construction projects in Sudan." Arabian Journal for Science and Engineering. https://doi.org/10.1007/s13369-017-2806-6 | es_ES |
dc.description.references | Mahamid I. (2017a). "Analysis of schedule deviations in road construction projects and the effects of project physical characteristics." Journal of Financial Management of Property and Construction 22(2) 192–210. https://doi.org/10.1108/jfmpc-07-2016-003110.1108/JFMPC-07-2016-0031 | es_ES |
dc.description.references | Mahamid I. (2017b). "Schedule delay in Saudi Arabia road construction projects: size estimate determinants and effects." International Journal of Architecture Engineering and Construction 6(3) 51–58. https://doi.org/10.7492/IJAEC.2017.01710.7492/IJAEC.2017.017 | es_ES |
dc.description.references | Mahamid I. Bruland A. & Dmaidi N. (2012). "Causes of delay in road construction projects." Journal of Management in Engineering 28(3) 300–310. https://doi.org/10.1061/(asce)me.1943-5479.000009610.1061/(ASCE)ME.1943-5479.0000096 | es_ES |
dc.description.references | . S. K. P. (2013). CAUSES OF DELAY IN INDIAN TRANSPORTATION INFRASTRUCTURE PROJECTS. International Journal of Research in Engineering and Technology, 02(11), 71-80. doi:10.15623/ijret.2013.0211013 | es_ES |
dc.description.references | Rachid Z. Toufik B. & Mohammed B. (2018). "Causes of schedule delays in construction projects in Algeria." International Journal of Construction Management 3599 1–11. https://doi.org/10.1080/15623599.2018.1435234 | es_ES |
dc.description.references | Santoso D. & Soeng S. (2016). "Analyzing delays of road construction projects in Cambodia: causes and effects." Journal of Management in Engineering 32(6) 1–11. https://doi.org/10.1061/(ASCE)ME.1943-5479.000046710.1061/(ASCE)ME.1943-5479.0000467 | es_ES |
dc.description.references | Venkateswaran C. B. & Murugasan R. (2017). "Time delay and cost overrun of road over bridge (ROB) construction projects in India." Journal of Construction in Developing Countries 22(November) 79–96. https://doi.org/10.21315/jcdc2017.22.supp1.510.21315/jcdc2017.22.supp1.5 | es_ES |