Wong, J. M. W., Thomas Ng, S., & Chan, A. P. C. (2010). Strategic planning for the sustainable development of the construction industry in Hong Kong. Habitat International, 34(2), 256-263. doi:10.1016/j.habitatint.2009.10.002
Sobotka, A. (2017). Innovative solutions in engineering of construction projects. Procedia Engineering, 208, 160-165. doi:10.1016/j.proeng.2017.11.034
Kaplinski, O. (2013). Risk Management of Construction Works by Means of the Utility Theory: A Case Study. Procedia Engineering, 57, 533-539. doi:10.1016/j.proeng.2013.04.068
[+]
Wong, J. M. W., Thomas Ng, S., & Chan, A. P. C. (2010). Strategic planning for the sustainable development of the construction industry in Hong Kong. Habitat International, 34(2), 256-263. doi:10.1016/j.habitatint.2009.10.002
Sobotka, A. (2017). Innovative solutions in engineering of construction projects. Procedia Engineering, 208, 160-165. doi:10.1016/j.proeng.2017.11.034
Kaplinski, O. (2013). Risk Management of Construction Works by Means of the Utility Theory: A Case Study. Procedia Engineering, 57, 533-539. doi:10.1016/j.proeng.2013.04.068
Diekmann, J. E., & Featherman, W. D. (1998). Assessing Cost Uncertainty: Lessons from Environmental Restoration Projects. Journal of Construction Engineering and Management, 124(6), 445-451. doi:10.1061/(asce)0733-9364(1998)124:6(445)
Špačková, O., Novotná, E., Šejnoha, M., & Šejnoha, J. (2013). Probabilistic models for tunnel construction risk assessment. Advances in Engineering Software, 62-63, 72-84. doi:10.1016/j.advengsoft.2013.04.002
Wang, W.-C., Wang, S.-H., Tsui, Y.-K., & Hsu, C.-H. (2012). A factor-based probabilistic cost model to support bid-price estimation. Expert Systems with Applications, 39(5), 5358-5366. doi:10.1016/j.eswa.2011.11.049
Alwan, Z., Jones, P., & Holgate, P. (2017). Strategic sustainable development in the UK construction industry, through the framework for strategic sustainable development, using Building Information Modelling. Journal of Cleaner Production, 140, 349-358. doi:10.1016/j.jclepro.2015.12.085
Chen, Y., Okudan, G. E., & Riley, D. R. (2010). Sustainable performance criteria for construction method selection in concrete buildings. Automation in Construction, 19(2), 235-244. doi:10.1016/j.autcon.2009.10.004
Opoku, D.-G. J., Ayarkwa, J., & Agyekum, K. (2019). Barriers to environmental sustainability of construction projects. Smart and Sustainable Built Environment, 8(4), 292-306. doi:10.1108/sasbe-08-2018-0040
Freire-Guerrero, A., Alba-Rodríguez, M. D., & Marrero, M. (2019). A budget for the ecological footprint of buildings is possible: A case study using the dwelling construction cost database of Andalusia. Sustainable Cities and Society, 51, 101737. doi:10.1016/j.scs.2019.101737
Cheng, W., Sodagar, B., & Sun, F. (2017). Comparative analysis of environmental performance of an office building using BREEAM and GBL. International Journal of Sustainable Development and Planning, 12(03), 528-540. doi:10.2495/sdp-v12-n3-528-540
Wang, G. B., He, G. Y., & Bian, L. (2011). Sustainable Construction Project under Lean Construction Theory. Advanced Materials Research, 250-253, 3345-3349. doi:10.4028/www.scientific.net/amr.250-253.3345
Zhong, Z. Y., & Chen, Y. G. (2011). Principles of Sustainable Construction Project Management Based on Lean Construction. Advanced Materials Research, 225-226, 766-770. doi:10.4028/www.scientific.net/amr.225-226.766
Rafindadi, A. D., Mikić, M., Kovačić, I., & Cekić, Z. (2014). Global Perception of Sustainable Construction Project Risks. Procedia - Social and Behavioral Sciences, 119, 456-465. doi:10.1016/j.sbspro.2014.03.051
Solís-Guzmán, J., Rivero-Camacho, C., Alba-Rodríguez, D., & Martínez-Rocamora, A. (2018). Carbon Footprint Estimation Tool for Residential Buildings for Non-Specialized Users: OERCO2 Project. Sustainability, 10(5), 1359. doi:10.3390/su10051359
Baldry, D. (1998). The evaluation of risk management in public sector capital projects. International Journal of Project Management, 16(1), 35-41. doi:10.1016/s0263-7863(97)00015-x
Ranasinghe, M. (1994). Contingency allocation and management for building projects. Construction Management and Economics, 12(3), 233-243. doi:10.1080/01446199400000031
Plebankiewicz, E., Zima, K., & Wieczorek, D. (2016). Life Cycle Cost Modelling of Buildings with Consideration of the Risk. Archives of Civil Engineering, 62(2), 149-166. doi:10.1515/ace-2015-0071
Heralova, R. S. (2014). Life Cycle Cost Optimization Within Decision Making on Alternative Designs of Public Buildings. Procedia Engineering, 85, 454-463. doi:10.1016/j.proeng.2014.10.572
Hwang, B.-G., Shan, M., Phua, H., & Chi, S. (2017). An Exploratory Analysis of Risks in Green Residential Building Construction Projects: The Case of Singapore. Sustainability, 9(7), 1116. doi:10.3390/su9071116
Lee, J. K., Han, S. H., Jang, W., & Jung, W. (2017). «Win-win strategy» for sustainable relationship between general contractors and subcontractors in international construction projects. KSCE Journal of Civil Engineering, 22(2), 428-439. doi:10.1007/s12205-017-1613-7
Artto, K. A., Lehtonen, J.-M., & Saranen, J. (2001). Managing projects front-end: incorporating a strategic early view to project management with simulation. International Journal of Project Management, 19(5), 255-264. doi:10.1016/s0263-7863(99)00082-4
Walȩdzik, K., & Mańdziuk, J. (2018). Applying hybrid Monte Carlo Tree Search methods to Risk-Aware Project Scheduling Problem. Information Sciences, 460-461, 450-468. doi:10.1016/j.ins.2017.08.049
Van Slyke, R. M. (1963). Letter to the Editor—Monte Carlo Methods and the PERT Problem. Operations Research, 11(5), 839-860. doi:10.1287/opre.11.5.839
Chau, K. W. (1995). Monte Carlo simulation of construction costs using subjective data. Construction Management and Economics, 13(5), 369-383. doi:10.1080/01446199500000042
Beeston *, D. (1986). Combining risks in estimating. Construction Management and Economics, 4(1), 75-79. doi:10.1080/01446198600000005
Górecki, J., & Płoszaj, E. (2019). Cost risk of construction of small hydroelectric power plants. MATEC Web of Conferences, 262, 07004. doi:10.1051/matecconf/201926207004
Zhang, H. Y., & Yang, G. B. (2011). Review of Study on Risk Management for the Construction Project. Advanced Materials Research, 243-249, 6404-6409. doi:10.4028/www.scientific.net/amr.243-249.6404
Xia, N., Zou, P. X. W., Griffin, M. A., Wang, X., & Zhong, R. (2018). Towards integrating construction risk management and stakeholder management: A systematic literature review and future research agendas. International Journal of Project Management, 36(5), 701-715. doi:10.1016/j.ijproman.2018.03.006
Siraj, N. B., & Fayek, A. R. (2019). Risk Identification and Common Risks in Construction: Literature Review and Content Analysis. Journal of Construction Engineering and Management, 145(9), 03119004. doi:10.1061/(asce)co.1943-7862.0001685
Díaz-Madroñero, M., Mula, J., & Peidro, D. (2014). A review of discrete-time optimization models for tactical production planning. International Journal of Production Research, 52(17), 5171-5205. doi:10.1080/00207543.2014.899721
Díaz-Madroñero, M., Peidro, D., & Mula, J. (2015). A review of tactical optimization models for integrated production and transport routing planning decisions. Computers & Industrial Engineering, 88, 518-535. doi:10.1016/j.cie.2015.06.010
Li, B., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005). Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK. Engineering, Construction and Architectural Management, 12(2), 125-148. doi:10.1108/09699980510584485
Zou, P. X. W., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), 601-614. doi:10.1016/j.ijproman.2007.03.001
Mohamed, F. D. (2012). Integrating Risk Assessment in Planning for Sustainable Infrastructure Projects. ICSDEC 2012. doi:10.1061/9780784412688.042
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014). Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Applied Soft Computing, 17, 105-116. doi:10.1016/j.asoc.2014.01.003
Chou, J.-S., & Le, T.-S. (2014). Probabilistic multiobjective optimization of sustainable engineering design. KSCE Journal of Civil Engineering, 18(4), 853-864. doi:10.1007/s12205-014-0373-x
Dziadosz, A., Tomczyk, A., & Kapliński, O. (2015). Financial Risk Estimation in Construction Contracts. Procedia Engineering, 122, 120-128. doi:10.1016/j.proeng.2015.10.015
Lee, S., & Kim, K. (2015). Collar Option Model for Managing the Cost Overrun Caused by Change Orders. Sustainability, 7(8), 10649-10663. doi:10.3390/su70810649
Kankhva, V. (2016). Methodic Approaches to Cost Evaluation of Innovation Projects in Underground Development. Procedia Engineering, 165, 1305-1309. doi:10.1016/j.proeng.2016.11.855
Badi, S. M., & Pryke, S. (2016). Assessing the impact of risk allocation on sustainable energy innovation (SEI). International Journal of Managing Projects in Business, 9(2), 259-281. doi:10.1108/ijmpb-10-2015-0103
Ayub, B., Thaheem, M. J., & Din, Z. ud. (2016). Dynamic Management of Cost Contingency: Impact of KPIs and Risk Perception. Procedia Engineering, 145, 82-87. doi:10.1016/j.proeng.2016.04.021
Ali, Z., Zhu, F., & Hussain, S. (2018). Risk Assessment of Ex-Post Transaction Cost in Construction Projects Using Structural Equation Modeling. Sustainability, 10(11), 4017. doi:10.3390/su10114017
Baudrit, C., Taillandier, F., Tran, T. T. P., & Breysse, D. (2018). Uncertainty Processing and Risk Monitoring in Construction Projects Using Hierarchical Probabilistic Relational Models. Computer-Aided Civil and Infrastructure Engineering, 34(2), 97-115. doi:10.1111/mice.12391
Flyvbjerg, B., Ansar, A., Budzier, A., Buhl, S., Cantarelli, C., Garbuio, M., … van Wee, B. (2018). Five things you should know about cost overrun. Transportation Research Part A: Policy and Practice, 118, 174-190. doi:10.1016/j.tra.2018.07.013
Cantarelli, C. C., van Wee, B., Molin, E. J. E., & Flyvbjerg, B. (2012). Different cost performance: different determinants? Transport Policy, 22, 88-95. doi:10.1016/j.tranpol.2012.04.002
Cantarelli, C. C., Molin, E. J. E., van Wee, B., & Flyvbjerg, B. (2012). Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases. Transport Policy, 22, 49-56. doi:10.1016/j.tranpol.2012.04.001
Skamris, M. K., & Flyvbjerg, B. (1997). Inaccuracy of traffic forecasts and cost estimates on large transport projects. Transport Policy, 4(3), 141-146. doi:10.1016/s0967-070x(97)00007-3
Flyvbjerg, B., Skamris holm, M. K., & Buhl, S. L. (2003). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1), 71-88. doi:10.1080/01441640309904
Plebankiewicz, E. (2018). Model of Predicting Cost Overrun in Construction Projects. Sustainability, 10(12), 4387. doi:10.3390/su10124387
Cavalieri, M., Cristaudo, R., & Guccio, C. (2019). On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects. Transport Policy, 79, 21-36. doi:10.1016/j.tranpol.2019.04.001
Li, S., Lu, Y., Kua, H. W., & Chang, R. (2020). The economics of green buildings: A life cycle cost analysis of non-residential buildings in tropic climates. Journal of Cleaner Production, 252, 119771. doi:10.1016/j.jclepro.2019.119771
Švajlenka, J., & Kozlovská, M. (2020). Evaluation of the efficiency and sustainability of timber-based construction. Journal of Cleaner Production, 259, 120835. doi:10.1016/j.jclepro.2020.120835
Švajlenka, J., Kozlovská, M., & Pošiváková, T. (2018). Analysis of Selected Building Constructions Used in Industrial Construction in Terms of Sustainability Benefits. Sustainability, 10(12), 4394. doi:10.3390/su10124394
Lei, Z., Tang, W., Duffield, C., Zhang, L., Hui, F., & You, R. (2018). Qualitative Analysis of the Occupational Health and Safety Performance of Chinese International Construction Projects. Sustainability, 10(12), 4344. doi:10.3390/su10124344
Yang, Y., Tang, W., Shen, W., & Wang, T. (2019). Enhancing Risk Management by Partnering in International EPC Projects: Perspective from Evolutionary Game in Chinese Construction Companies. Sustainability, 11(19), 5332. doi:10.3390/su11195332
Kapelko, M., Oude Lansink, A., & Stefanou, S. E. (2014). Assessing dynamic inefficiency of the Spanish construction sector pre- and post-financial crisis. European Journal of Operational Research, 237(1), 349-357. doi:10.1016/j.ejor.2014.01.047
Sfakianaki, E., Iliadis, T., & Zafeiris, E. (2015). Crisis management under an economic recession in construction: the Greek case. International Journal of Management and Decision Making, 14(4), 373. doi:10.1504/ijmdm.2015.074015
[-]