Analysis of the project success factor through time, cost, labour, health, safety, environment and quality aspects at PT XYZ

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.author Komarudin, Moh es_ES
dc.contributor.author Nugroho, Rosalendro Eddy es_ES
dc.date.accessioned 2022-02-07T09:46:43Z
dc.date.available 2022-02-07T09:46:43Z
dc.date.issued 2022-01-31
dc.identifier.uri http://hdl.handle.net/10251/180585
dc.description.abstract [EN] This study aims to analyze the failure factors of PT. XYZ in 2018 – 2020 in terms of time, cost, labor, Health, Safety, and Environment (HSE), and quality based on the Success Project Factor (SPF). It includes 183 projects with the Non-Probability Sampling technique. The researcher uses fishbone and Pareto to identify problems. The results showed Schedule Performance Index (SPI) < 1 indicated the project is in the late category, the Cost Performance Index (CPI) < 1 indicated cost overrun, Safety Performance Index (SFPI) > 0 indicated the K3 target could not be reached, the Client Satisfaction Index (CSI) = 34.03, indicated that it is in the dissatisfied category, then Productivity Coefficient Plan < Realization, it meant the workforce was less productive. After the analysis of fishbone and Pareto, the data show that the highest cause was 13% due to lack of supervision, project cost aspects were 13% due to delays, HSE project aspect were 13% due to no K3 process before work begins, the quality aspect was 17% due to no training, and the labor aspect was 17% due to poor worker discipline. es_ES
dc.description.sponsorship Mercubuana University es_ES
dc.language Inglés es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.relation.ispartof International Journal of Production Management and Engineering es_ES
dc.rights Reconocimiento - No comercial - Sin obra derivada (by-nc-nd) es_ES
dc.subject Success Project Factor es_ES
dc.subject Schedule Performance es_ES
dc.subject Cost Performance es_ES
dc.subject Safety Performance es_ES
dc.subject Productivity Coefficient es_ES
dc.subject Client Satisfaction es_ES
dc.title Analysis of the project success factor through time, cost, labour, health, safety, environment and quality aspects at PT XYZ es_ES
dc.type Artículo es_ES
dc.identifier.doi 10.4995/ijpme.2022.16021
dc.rights.accessRights Abierto es_ES
dc.description.bibliographicCitation Komarudin, M.; Nugroho, RE. (2022). Analysis of the project success factor through time, cost, labour, health, safety, environment and quality aspects at PT XYZ. International Journal of Production Management and Engineering. 10(1):33-50. https://doi.org/10.4995/ijpme.2022.16021 es_ES
dc.description.accrualMethod OJS es_ES
dc.relation.publisherversion https://doi.org/10.4995/ijpme.2022.16021 es_ES
dc.description.upvformatpinicio 33 es_ES
dc.description.upvformatpfin 50 es_ES
dc.type.version info:eu-repo/semantics/publishedVersion es_ES
dc.description.volume 10 es_ES
dc.description.issue 1 es_ES
dc.identifier.eissn 2340-4876
dc.relation.pasarela OJS\16021 es_ES
dc.description.references Arianie, G. P., & Puspitasari, N. B. (2017). Perencanaan Manajemen Proyek Dalam Meningkatkan Efisiensi Dan Efektifitas Sumber Daya Perusahaan (Studi Kasus: Qiscus Pte Ltd). Jurnal Teknik Industri, 12(3), 189-196. https://doi.org/10.14710/jati.12.3.189-196 es_ES
dc.description.references Ayano, E., & Teshome, W. (2018). Factors Contributing for Delay in Government Construction Projects in Oromia, Ethiopia. The International Journal of Business & Management, 6(1), 131-146. es_ES
dc.description.references Dharsika, I. G. E., Budiartha, I. N., & Yansen, I. W. (2017). Analisis Kualitas Manajer Proyek Terhadap Pelaksanaan Proyek Konstruksi (Studi Kasus: Di Denpasar dan Badung). Jurnal Spektran, 5(1). https://doi.org/10.24843/SPEKTRAN.2017.v05.i01.p02 es_ES
dc.description.references Dharma, A. A. B., Putera, I. G. A. A., & Parami, A. A. D. (2017). Manajemen Risiko Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Jambuluwuk Hotel & Resort. Jurnal Spektran 5(1), 1-87. https://doi.org/10.24843/SPEKTRAN.2017.v05.i01.p06 es_ES
dc.description.references Frefer, Mahmoud, Haleema, & Almamlook. (2018). Overview Success Criteria and Critical Success Factors in Project Management. Industrial Engineering & Management, 07(01). https://doi.org/10.4172/2169-0316.1000244 es_ES
dc.description.references Ismiyati, I., Sanggawuri, R., & Handajani, M. Penerapan Manajemen Resiko pada Pembangunan Proyek Perpanjangan Dermaga log (Studi Kasus: Pelabuhan DalamTanjung Emas Semarang). Media Komunikasi Teknik Sipil, 25(2), 209-220. https://doi.org/10.14710/mkts.v25i2.19467 es_ES
dc.description.references Kamau, M. E., Jane, G., & John, K. (2018). Influence of Human Related Factors on Success of Construction Projects in Kenya. The International Journal of Business & Management, 6(5), 251-283. es_ES
dc.description.references Kathongo, S. M. (2017). Total Quality Management Practices and Performance of Rural Electricity Distribution Projects in Kenya. The International Journal of Business & Management, 5(3), 66-71. es_ES
dc.description.references Kerzner, H. (2010). Project Management - Best Practices - Achieving Global Excellenc 2nd ed. New York: John Wiley & Sons, Inc., Hoboken, New Jersey es_ES
dc.description.references Lesmana, I. P. D., & Antika, E. (2019). Manajemen Proyek Dengan Scrum. Absolute Media. es_ES
dc.description.references Maidamisa, A. A. (2017). Comparative Analysis of Activity Duration in Project Management. The International Journal of Business & Management, 5(12), 158-162. es_ES
dc.description.references Meiliawan, F., & Nugroho, R. E. (2020). Peningkatan Kualitas Pelayanan PT XYZ Sebagai Badan Sertifikasi ISO. Warta Pendidikan / e-Journal, 4(5), 4-10 es_ES
dc.description.references Messah, Y. A., Sina, D. A., & Manubulu, C. C. (2013). Analisa Indeks Biaya Untuk Pekerjaan Beton Bertulang Dengan Menggunakan Metode Sni 7394-2008 Dan Lapangan (Studi Kasus Pada Proyek Pembangunan Asrama STIKES Chmk Tahap III). Jurnal teknik sipil, 2(1), 49-62. es_ES
dc.description.references Miano, K. J. (2017). Managing Stakeholders Diversity in Determining Project Success: A Stakeholders Matrix Approach. The International Journal of Business & Management, 5(9), 1-4. es_ES
dc.description.references Ogolla, P. J., Mugambi, F., & Obwongi, J. (2019). Influence of Project Organizational Risk Management Policy on Performance of Mom-basa County Government Projects, Kenya. The International Journal of Business & Management, 7(5). https://doi.org/10.24940/theijbm/2019/v7/i5/BM1905-013 es_ES
dc.description.references Rochman, F., & Wahyuni, H. C. (2018). Analisa Pengaruh Pengen-dalian Kinerja Proyek Terhadap Mutu Proyek Konstruksi Dengan Menggunakan Uji Statistika. Jurnal Teknik Industri, 12(1), 01-06. https://doi.org/10.14710/jati.12.1.01-06 es_ES
dc.description.references Septiawan, D. B., & Bekti, R. (2016). Analysis of Project Construction Delay Using Fishbone Diagram at PT Rekayasa Industri. Journal of business and management, 5(5), 634-650. es_ES
dc.description.references Sutawijaya, A. H., & Nawangsari, L. C. (2018). The Strategic of Implementation Health and Safety to Improved Performance Construction Management System (Case in Arcamanic project, Indonesia). International Journal of Engineering & Technology, 7(2.29), 176-181. https://doi.org/10.14419/ijet.v7i2.29.13312 es_ES
dc.description.references Sutawidjaya, A.H., Nawangsari, L.C. & Djamil, M. (2019). Operasi Strategi & Proses Manajemen. Jakarta: Mitra Wacana Media es_ES
dc.description.references Wang, X., & Nagahira, A. (2017). The Impact of User Innovation on New Product Development Project Success in Japanese Firms, Comparative Study between B2B and B2C Projects. The Interna-tional Journal of Business & Management, 5(7), 287-297. es_ES
dc.description.references Wicaksono, I.Y. (2016). Analisis Kinerja Pekerja Pada Keterlambatan Proses Fabrikasi Pengerjaan Proyek Coal Fired Boiler Milik PT Alstom Power Esi Surabaya. S.T. Skripsi. Fakultas Teknologi Kelautan Institut Teknologi Sepuluh Nopember: Sura-baya. es_ES
dc.description.references Yanova, N. (2015). Assessment of satisfaction with the quality of education: customer satisfaction index. Procedia-Social and Behavioral Sciences, 182, 566-573. https://doi.org/10.1016/j.sbspro.2015.04.782 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem