dc.contributor.author | Komarudin, Moh | es_ES |
dc.contributor.author | Nugroho, Rosalendro Eddy | es_ES |
dc.date.accessioned | 2022-02-07T09:46:43Z | |
dc.date.available | 2022-02-07T09:46:43Z | |
dc.date.issued | 2022-01-31 | |
dc.identifier.uri | http://hdl.handle.net/10251/180585 | |
dc.description.abstract | [EN] This study aims to analyze the failure factors of PT. XYZ in 2018 – 2020 in terms of time, cost, labor, Health, Safety, and Environment (HSE), and quality based on the Success Project Factor (SPF). It includes 183 projects with the Non-Probability Sampling technique. The researcher uses fishbone and Pareto to identify problems. The results showed Schedule Performance Index (SPI) < 1 indicated the project is in the late category, the Cost Performance Index (CPI) < 1 indicated cost overrun, Safety Performance Index (SFPI) > 0 indicated the K3 target could not be reached, the Client Satisfaction Index (CSI) = 34.03, indicated that it is in the dissatisfied category, then Productivity Coefficient Plan < Realization, it meant the workforce was less productive. After the analysis of fishbone and Pareto, the data show that the highest cause was 13% due to lack of supervision, project cost aspects were 13% due to delays, HSE project aspect were 13% due to no K3 process before work begins, the quality aspect was 17% due to no training, and the labor aspect was 17% due to poor worker discipline. | es_ES |
dc.description.sponsorship | Mercubuana University | es_ES |
dc.language | Inglés | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.relation.ispartof | International Journal of Production Management and Engineering | es_ES |
dc.rights | Reconocimiento - No comercial - Sin obra derivada (by-nc-nd) | es_ES |
dc.subject | Success Project Factor | es_ES |
dc.subject | Schedule Performance | es_ES |
dc.subject | Cost Performance | es_ES |
dc.subject | Safety Performance | es_ES |
dc.subject | Productivity Coefficient | es_ES |
dc.subject | Client Satisfaction | es_ES |
dc.title | Analysis of the project success factor through time, cost, labour, health, safety, environment and quality aspects at PT XYZ | es_ES |
dc.type | Artículo | es_ES |
dc.identifier.doi | 10.4995/ijpme.2022.16021 | |
dc.rights.accessRights | Abierto | es_ES |
dc.description.bibliographicCitation | Komarudin, M.; Nugroho, RE. (2022). Analysis of the project success factor through time, cost, labour, health, safety, environment and quality aspects at PT XYZ. International Journal of Production Management and Engineering. 10(1):33-50. https://doi.org/10.4995/ijpme.2022.16021 | es_ES |
dc.description.accrualMethod | OJS | es_ES |
dc.relation.publisherversion | https://doi.org/10.4995/ijpme.2022.16021 | es_ES |
dc.description.upvformatpinicio | 33 | es_ES |
dc.description.upvformatpfin | 50 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 10 | es_ES |
dc.description.issue | 1 | es_ES |
dc.identifier.eissn | 2340-4876 | |
dc.relation.pasarela | OJS\16021 | es_ES |
dc.description.references | Arianie, G. P., & Puspitasari, N. B. (2017). Perencanaan Manajemen Proyek Dalam Meningkatkan Efisiensi Dan Efektifitas Sumber Daya Perusahaan (Studi Kasus: Qiscus Pte Ltd). Jurnal Teknik Industri, 12(3), 189-196. https://doi.org/10.14710/jati.12.3.189-196 | es_ES |
dc.description.references | Ayano, E., & Teshome, W. (2018). Factors Contributing for Delay in Government Construction Projects in Oromia, Ethiopia. The International Journal of Business & Management, 6(1), 131-146. | es_ES |
dc.description.references | Dharsika, I. G. E., Budiartha, I. N., & Yansen, I. W. (2017). Analisis Kualitas Manajer Proyek Terhadap Pelaksanaan Proyek Konstruksi (Studi Kasus: Di Denpasar dan Badung). Jurnal Spektran, 5(1). https://doi.org/10.24843/SPEKTRAN.2017.v05.i01.p02 | es_ES |
dc.description.references | Dharma, A. A. B., Putera, I. G. A. A., & Parami, A. A. D. (2017). Manajemen Risiko Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Jambuluwuk Hotel & Resort. Jurnal Spektran 5(1), 1-87. https://doi.org/10.24843/SPEKTRAN.2017.v05.i01.p06 | es_ES |
dc.description.references | Frefer, Mahmoud, Haleema, & Almamlook. (2018). Overview Success Criteria and Critical Success Factors in Project Management. Industrial Engineering & Management, 07(01). https://doi.org/10.4172/2169-0316.1000244 | es_ES |
dc.description.references | Ismiyati, I., Sanggawuri, R., & Handajani, M. Penerapan Manajemen Resiko pada Pembangunan Proyek Perpanjangan Dermaga log (Studi Kasus: Pelabuhan DalamTanjung Emas Semarang). Media Komunikasi Teknik Sipil, 25(2), 209-220. https://doi.org/10.14710/mkts.v25i2.19467 | es_ES |
dc.description.references | Kamau, M. E., Jane, G., & John, K. (2018). Influence of Human Related Factors on Success of Construction Projects in Kenya. The International Journal of Business & Management, 6(5), 251-283. | es_ES |
dc.description.references | Kathongo, S. M. (2017). Total Quality Management Practices and Performance of Rural Electricity Distribution Projects in Kenya. The International Journal of Business & Management, 5(3), 66-71. | es_ES |
dc.description.references | Kerzner, H. (2010). Project Management - Best Practices - Achieving Global Excellenc 2nd ed. New York: John Wiley & Sons, Inc., Hoboken, New Jersey | es_ES |
dc.description.references | Lesmana, I. P. D., & Antika, E. (2019). Manajemen Proyek Dengan Scrum. Absolute Media. | es_ES |
dc.description.references | Maidamisa, A. A. (2017). Comparative Analysis of Activity Duration in Project Management. The International Journal of Business & Management, 5(12), 158-162. | es_ES |
dc.description.references | Meiliawan, F., & Nugroho, R. E. (2020). Peningkatan Kualitas Pelayanan PT XYZ Sebagai Badan Sertifikasi ISO. Warta Pendidikan / e-Journal, 4(5), 4-10 | es_ES |
dc.description.references | Messah, Y. A., Sina, D. A., & Manubulu, C. C. (2013). Analisa Indeks Biaya Untuk Pekerjaan Beton Bertulang Dengan Menggunakan Metode Sni 7394-2008 Dan Lapangan (Studi Kasus Pada Proyek Pembangunan Asrama STIKES Chmk Tahap III). Jurnal teknik sipil, 2(1), 49-62. | es_ES |
dc.description.references | Miano, K. J. (2017). Managing Stakeholders Diversity in Determining Project Success: A Stakeholders Matrix Approach. The International Journal of Business & Management, 5(9), 1-4. | es_ES |
dc.description.references | Ogolla, P. J., Mugambi, F., & Obwongi, J. (2019). Influence of Project Organizational Risk Management Policy on Performance of Mom-basa County Government Projects, Kenya. The International Journal of Business & Management, 7(5). https://doi.org/10.24940/theijbm/2019/v7/i5/BM1905-013 | es_ES |
dc.description.references | Rochman, F., & Wahyuni, H. C. (2018). Analisa Pengaruh Pengen-dalian Kinerja Proyek Terhadap Mutu Proyek Konstruksi Dengan Menggunakan Uji Statistika. Jurnal Teknik Industri, 12(1), 01-06. https://doi.org/10.14710/jati.12.1.01-06 | es_ES |
dc.description.references | Septiawan, D. B., & Bekti, R. (2016). Analysis of Project Construction Delay Using Fishbone Diagram at PT Rekayasa Industri. Journal of business and management, 5(5), 634-650. | es_ES |
dc.description.references | Sutawijaya, A. H., & Nawangsari, L. C. (2018). The Strategic of Implementation Health and Safety to Improved Performance Construction Management System (Case in Arcamanic project, Indonesia). International Journal of Engineering & Technology, 7(2.29), 176-181. https://doi.org/10.14419/ijet.v7i2.29.13312 | es_ES |
dc.description.references | Sutawidjaya, A.H., Nawangsari, L.C. & Djamil, M. (2019). Operasi Strategi & Proses Manajemen. Jakarta: Mitra Wacana Media | es_ES |
dc.description.references | Wang, X., & Nagahira, A. (2017). The Impact of User Innovation on New Product Development Project Success in Japanese Firms, Comparative Study between B2B and B2C Projects. The Interna-tional Journal of Business & Management, 5(7), 287-297. | es_ES |
dc.description.references | Wicaksono, I.Y. (2016). Analisis Kinerja Pekerja Pada Keterlambatan Proses Fabrikasi Pengerjaan Proyek Coal Fired Boiler Milik PT Alstom Power Esi Surabaya. S.T. Skripsi. Fakultas Teknologi Kelautan Institut Teknologi Sepuluh Nopember: Sura-baya. | es_ES |
dc.description.references | Yanova, N. (2015). Assessment of satisfaction with the quality of education: customer satisfaction index. Procedia-Social and Behavioral Sciences, 182, 566-573. https://doi.org/10.1016/j.sbspro.2015.04.782 | es_ES |