Plan de ejecución BIM y modelado BIM para la gestión del proyecto de viviendas y habilitación urbana Las Lomas de Yura" en Arequipa (Perú).

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Plan de ejecución BIM y modelado BIM para la gestión del proyecto de viviendas y habilitación urbana Las Lomas de Yura" en Arequipa (Perú).

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Domingo Cabo, Alberto es_ES
dc.contributor.author Córdova Vela, Juan Antonio es_ES
dc.coverage.spatial east=-71.6415524; north=-16.2984393; name=Lomas de Yura en Arequipa. Perú es_ES
dc.date.accessioned 2023-09-15T17:59:27Z
dc.date.available 2023-09-15T17:59:27Z
dc.date.created 2023-07-25
dc.date.issued 2023-09-15 es_ES
dc.identifier.uri http://hdl.handle.net/10251/196621
dc.description.abstract [ES] En Perú el uso de BIM no es muy común en el desarrollo de proyectos de edificación y proyectos viales, generando sobrecostes en los proyectos, tanto en el sector público como en el privado. Según informe de la contraloría general de la república en el año 2018 en Perú 339 de los 867 proyectos paralizados, fueron debido a deficiencias técnicas. Con el pasar de los años, los proyectos de la industria de la construcción se han hecho cada vez más complejos, requiriendo de la participación de diferentes especialidades que interactúen para lograr un objetivo en común; sin embargo, la gestión integrada del proyecto se hace difícil a través herramientas digitales en dos dimensiones las cuales no facilitan una comprensión total del proyecto, obteniendo como resultado que el proyecto presente deficiencias técnicas, interferencias o que se tengan que realizar cambios durante el proceso para adaptarse a las necesidades del cliente Los sobrecostes, los excesos de plazo y los reclamos se han convertido en parte sistémica de los proyectos de construcción a lo largo del mundo. Teniendo en cuenta que un proyecto de construcción puede considerarse exitoso siempre y cuando se cumplan tres pilares fundamentales que son coste, plazo y calidad (Rosenfeld, 2014), es necesario el uso de herramientas tecnológicas que permitan reducir los riesgos y problemas que ocurren durante el ciclo de vida de los proyectos, desde su conceptualización hasta su puesta en marcha para su posterior operación y mantenimiento. El uso de BIM, presenta una alternativa para la gestión integrada de proyecto, permitiendo la visualización en 3D, la coordinación de los proyectos y la temprana detección y solución de interferencias, logrando así reducir tiempo y costes. ¿Los beneficios de utilizar BIM se extienden a toda la cadena de valor. Diversos estudios demuestran impactos positivos y mejora de la productividad. Según (Agarwal et al., 2018) un 75% de las empresas que han adoptado BIM lograron un retorno positivo de la inversión a través de ciclos de vida del proyecto más cortos, generando ahorro en gastos indirectos y materiales.¿ (Ministerio de Economía y Finanzas, 2021b) El presente TFM presenta la elaboración del plan de ejecución BIM (Building Execution Plan) del proyecto Las Lomas de Yura, un proyecto de inmobiliario desarrollado en la ciudad de Arequipa, Perú, en el cual no se utilizó BIM como metodología de gestión, y tomando en cuenta que la inmobiliaria continuará con el desarrollo de proyectos en la ciudad, el plan de ejecución BIM del proyecto servirá como punto de partida para la implantación de BIM en posteriores proyectos. El presente TFM presenta el contexto del desarrollo del proyecto, marco teórico y el plan de ejecución BIM. es_ES
dc.description.abstract [EN] In Peru the use of BIM is not very common in the development of building and road projects, generating cost overruns and delays in both the public and private sectors. According to a report by the Comptroller General of the Republic in Peru, 339 of the 867 paralyzed projects were due to technical issues. Over the years, projects in the construction industry have become increasingly complex, requiring the participation of different specialties that interact to achieve a common goal; however, integrated project management is difficult through digital tools in two dimensions which do not facilitate a full understanding of the project, resulting in the project having technical deficiencies, interferences or having to make changes during the process to adapt to customer needs. Cost overruns, schedule overruns, and claims have become a systemic part of construction projects throughout the world. Considering that a construction project can be considered successful as long as three fundamental pillars are met which are cost, schedule, and quality (Rosenfeld, 2014), the use of technological tools is necessary to reduce the risks and problems that occur during the life cycle of projects, from conceptualization to commissioning for subsequent operation and maintenance. The use of BIM, presents an alternative for integrated project management, allowing 3D visualization, project coordination, and early detection and resolution of interferences, thus reducing time and costs. "The benefits of using BIM extend to the entire value chain. Several studies demonstrate positive impacts and productivity improvement. According to (Agarwal et al., 2018) 75% of companies that have adopted BIM achieved a positive return on investment through shorter project life cycles, generating savings in overhead and material costs." (Ministry of Economy and Finance, 2021b) This TFM presents the elaboration of the BIM execution plan (Building Execution Plan) of the Las Lomas de Yura project, a real estate project developed in the city of Arequipa, Peru, in which BIM was not used as a management methodology, and taking into account that the real estate company will continue with the development of projects in the city, the BIM execution plan of the project will serve as a starting point for the implementation of BIM in subsequent projects. This TFM presents the context of the project development, theoretical framework, and the BIM execution plan. es_ES
dc.format.extent 114 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reconocimiento - No comercial - Sin obra derivada (by-nc-nd) es_ES
dc.subject BIM es_ES
dc.subject Digitalización es_ES
dc.subject Gestión de proyectos es_ES
dc.subject Retrasos es_ES
dc.subject Plan de ejecución BIM es_ES
dc.subject Modelado BIM es_ES
dc.subject Modelado 4D es_ES
dc.subject Interoperatibilidad es_ES
dc.subject Infraworks es_ES
dc.subject Navisworks es_ES
dc.subject Revit es_ES
dc.subject Perú es_ES
dc.subject Digitalization es_ES
dc.subject Project Management es_ES
dc.subject Delays es_ES
dc.subject Building Execution Plan es_ES
dc.subject BIM Modelling es_ES
dc.subject 4D Modelling es_ES
dc.subject Interoperatibility es_ES
dc.subject.classification INGENIERIA DE LA CONSTRUCCION es_ES
dc.subject.other Máster Universitario en Planificación y Gestión en Ingeniería Civil-Màster Universitari en Planificació i Gestió en Enginyeria Civil es_ES
dc.title Plan de ejecución BIM y modelado BIM para la gestión del proyecto de viviendas y habilitación urbana Las Lomas de Yura" en Arequipa (Perú). es_ES
dc.title.alternative Building execution plan and BIM modeling for project management in the household and urban development project named Las Lomas de Yura in Arequipa (Peru). es_ES
dc.title.alternative Pla d execució i modelatge BIM per a la gestió del projecte d habitatges i habilitació urbana Les Llomes de Yura" en Arequipa (Perú) es_ES
dc.type Tesis de máster es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos - Escola Tècnica Superior d'Enginyers de Camins, Canals i Ports es_ES
dc.description.bibliographicCitation Córdova Vela, JA. (2023). Plan de ejecución BIM y modelado BIM para la gestión del proyecto de viviendas y habilitación urbana Las Lomas de Yura" en Arequipa (Perú). Universitat Politècnica de València. http://hdl.handle.net/10251/196621 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\153847 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)