Mostrar el registro completo del ítem
Beldar, P.; Moghtader, M.; Giret Boggino, AS.; Ansaripoord, AH. (2022). Non-identical parallel machines batch processing problem with release dates, due dates and variable maintenance activity to minimize total tardiness. Computers & Industrial Engineering. 168:1-28. https://doi.org/10.1016/j.cie.2022.108135
Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/197768
Título: | Non-identical parallel machines batch processing problem with release dates, due dates and variable maintenance activity to minimize total tardiness | |
Autor: | Beldar, Pedram Moghtader, Milad Ansaripoord, Amir Hossein | |
Entidad UPV: |
|
|
Fecha difusión: |
|
|
Resumen: |
[EN]
Combination of job scheduling and maintenance activity has been widely investigated in the literature. We consider a non-identical parallel machines batch processing (BP) problem with release dates, due dates and ...[+]
|
|
Palabras clave: |
|
|
Derechos de uso: | Reserva de todos los derechos | |
Fuente: |
|
|
DOI: |
|
|
Editorial: |
|
|
Versión del editor: | https://doi.org/10.1016/j.cie.2022.108135 | |
Tipo: |
|