Mostrar el registro completo del ítem
García, ME.; Valero Cubas, S.; Argente, E.; Giret Boggino, AS.; Julian, V. (2008). A FAST Method to Achieve Flexible Production Programming Systems. IEEE Transactions on Systems Man and Cybernetics Part C (Applications and Reviews). 38(2):242-252. https://doi.org/10.1109/TSMCC.2007.913921
Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/202564
Título: | A FAST Method to Achieve Flexible Production Programming Systems | |
Autor: | García, Mª Emilia | |
Entidad UPV: |
|
|
Fecha difusión: |
|
|
Resumen: |
[EN] One of the main critical problems in manufacturing system domains is the production scheduling process, because an agile and reactive production planning and scheduling system is essential in manufacturing. The ...[+]
|
|
Palabras clave: |
|
|
Derechos de uso: | Reserva de todos los derechos | |
Fuente: |
|
|
DOI: |
|
|
Editorial: |
|
|
Versión del editor: | https://doi.org/10.1109/TSMCC.2007.913921 | |
Descripción: |
|
|
Tipo: |
|