Influence of public procurement criteria on delays and cost overruns for the construction of interurban roads in Peru.

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Influence of public procurement criteria on delays and cost overruns for the construction of interurban roads in Peru.

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Montalbán Domingo, María Laura es_ES
dc.contributor.advisor García Segura, Tatiana es_ES
dc.contributor.author Chavez Quiroga, Lucía Gabriela es_ES
dc.coverage.spatial east=-75.015152; north=-9.189967; Perú es_ES
dc.date.accessioned 2024-02-15T14:58:21Z
dc.date.available 2024-02-15T14:58:21Z
dc.date.created 2024-02-08
dc.date.issued 2024-02-15 es_ES
dc.identifier.uri http://hdl.handle.net/10251/202670
dc.description.abstract [ES] El Trabajo de Fin de Máster estudia los retrasos, sobrecostes y los riesgos que los generan durante la fase de construcción de las carreteras vecinales en Perú. A partir de datos públicos obtenidos de la plataforma INFObras, el Sistema de Seguimiento de Inversiones (SSI), el buscador de procedimientos de selección del Sistema Electrónico de Contrataciones del Estado (SE@CE), y el buscador público Cuaderno de Obra Digital (COD), se recopila información respecto al proceso de licitación, contratación y ejecución de los contratos de obras, obteniendo datos como la duración de la licitación, el plazo y coste de contratación, el avance físico y financiero en la ejecución, ampliaciones de plazo y adicionales de obra, liquidación del proyecto, entre otros. A partir de esto, se caracteriza la contratación de los proyectos; se determinan los retrasos y sobrecostes, en cuanto a ocurrencia y magnitud, así como si tienen relación significativa con las características de contratación. Adicionalmente, se identifican los riesgos más importantes que provocan retraso y sobre coste, sus impactos y si tienen relación significativa con las características de contratación. El trabajo de investigación se limita a la fase de construcción de carreteras vecinales en Perú, también llamadas carreteras interurbanas. Todas las carreteras vecinales consideradas en el análisis están registradas en el portal web de INFObras y se caracterizan por ser proyectos de construcción nueva, finalizados, con modalidad de ejecución por contrata, estrategia de pago a precios unitarios y estrategia de contratación de Proyecto-Licitación-Construcción. es_ES
dc.description.abstract [EN] Highway projects are considered high-risk due to their extensive impact on a nation's economic and social landscape. As they are public works, these projects require efficient and productive execution of high quality while ensuring that the costs remain low and the timeframe is short. However, highway construction projects worldwide often experience delays and cost overruns, which can result in unfavorable economic consequences. This also casts doubt on institutions' ability to manage public funds responsibly. To prevent this, effective risk management is essential in highway projects, and the contracting strategy for highway projects has a key role in their success and should be chosen carefully based on the project's characteristics. With its poorly developed road infrastructure, Peru must prioritize improving highway construction projects to bridge the gap and contribute to its economic growth. The objective of this study is to (1) analyze the effects of hiring features on delays and cost overruns in road projects in Peru base on its hiring features, (2) pinpoint the most significant risks associated with delays and cost overruns in road projects, and (3) investigate the influence of hiring features on the occurrence and magnitudes of these delay and cost overrun risks. A review of the relevant literature was conducted to identify the risks associated with delays and cost overruns in construction projects. A risk breakdown structure (RBS) was then developed. Contract data was collected for 127 highway projects in Peru to identify delay and cost overrun risks and define contracting characteristics for analysis. The highway projects were characterized using descriptive statistics. Logistic and linear regressions were used to analyze data related to delays and cost overruns. Finally, the risks were evaluated using the probability and impact matrix to identify the most significant, and were statistically analyzed with respect to hiring features using logistic and linear regressions. The results showed that delays and cost overruns are common in highway construction projects and often occur simultaneously. Several hiring features, including contract size, contract execution period, promoter type, geographical region, bidding process period, and award coefficient, were found to influence the likelihood and magnitude of delays and cost overruns. The most significant delay risks were delays in responding to requests, problems with owners surrounding the work site, adverse weather conditions, and COVID-19. The most significant cost overrun risks were land availability problems, inaccurate estimates of the project's cost, mistakes, omissions, and discrepancies in project documents, inadequate site investigations, problems with owners surrounding the work site, inflation/market fluctuation, and adverse weather conditions. The identify of significant delay and cost overrun risks in public investment projects, such as road projects, can greatly assist in the effective risk management of such projects. By pinpointing the hiring features that contribute to these delays and cost overruns, management strategies that are better equipped to handle these issues can be proposed. As a result, this can reduce delays and cost overruns, thus ensuring the successful completion of public investment projects. es_ES
dc.format.extent 66 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Licitación es_ES
dc.subject Construcción es_ES
dc.subject Retraso es_ES
dc.subject Sobrecoste es_ES
dc.subject Carreteras es_ES
dc.subject Contratación es_ES
dc.subject Riesgos. es_ES
dc.subject Tender es_ES
dc.subject Construction es_ES
dc.subject Delay es_ES
dc.subject Cost overrun es_ES
dc.subject Roads es_ES
dc.subject Contracting es_ES
dc.subject Risks es_ES
dc.subject.classification PROYECTOS DE INGENIERIA es_ES
dc.subject.other Máster Universitario en Planificación y Gestión en Ingeniería Civil-Màster Universitari en Planificació i Gestió en Enginyeria Civil es_ES
dc.title Influence of public procurement criteria on delays and cost overruns for the construction of interurban roads in Peru. es_ES
dc.title.alternative Influence of public procurement criteria on delays and cost overruns for the construction of interurban roads in Peru. es_ES
dc.title.alternative Influència dels criteris de contractació pública en els retards i sobrecostos per a la construcció de carreteres interurbanes al Perú. es_ES
dc.type Tesis de máster es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos - Escola Tècnica Superior d'Enginyers de Camins, Canals i Ports es_ES
dc.description.bibliographicCitation Chavez Quiroga, LG. (2024). Influence of public procurement criteria on delays and cost overruns for the construction of interurban roads in Peru. Universitat Politècnica de València. http://hdl.handle.net/10251/202670 es_ES