Mostrar el registro completo del ítem
Palacín, CG.; Pitarch, JL.; Vilas, C.; De Prada, C. (2023). Integrating Continuous and Batch Processes with Shared Resources in Closed-Loop Scheduling: A Case Study on Tuna Cannery. Industrial & Engineering Chemistry Research. 62(23):9278-9289. https://doi.org/10.1021/acs.iecr.3c00754
Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/204668
Título: | Integrating Continuous and Batch Processes with Shared Resources in Closed-Loop Scheduling: A Case Study on Tuna Cannery | |
Autor: | Palacín, Carlos G. Vilas, Carlos de Prada, César | |
Entidad UPV: |
|
|
Fecha difusión: |
|
|
Resumen: |
[EN] Scheduling tasks in production facilities are usually hybrid optimization problems of a large combinatorial nature. They involve solving, in near-real time, the integration of the operation of several batch units of ...[+]
|
|
Palabras clave: |
|
|
Derechos de uso: | Reconocimiento (by) | |
Fuente: |
|
|
DOI: |
|
|
Editorial: |
|
|
Versión del editor: | https://doi.org/10.1021/acs.iecr.3c00754 | |
Código del Proyecto: |
|
|
Agradecimientos: |
These results are part of project a-CIDiT, grants PID2021-123654OB-C31 and PID2021-123654OB-C32 funded by MCIN/AEI/10.13039/501100011033/FEDER, UE. Funding for open access charge: CRUE-Universitat Politecnica de Valencia. ...[+]
|
|
Tipo: |
|