- -

MILP for the Inventory and Routing for Replenishment Problem in the Car Assembly Line

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

MILP for the Inventory and Routing for Replenishment Problem in the Car Assembly Line

Mostrar el registro completo del ítem

Pulido, R.; Garcia-Sánchez, Á.; Ortega-Mier, M.; Brun, A. (2014). MILP for the Inventory and Routing for Replenishment Problem in the Car Assembly Line. International Journal of Production Management and Engineering. 2(1):37-45. https://doi.org/10.4995/ijpme.2014.1838

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/35024

Ficheros en el ítem

Metadatos del ítem

Título: MILP for the Inventory and Routing for Replenishment Problem in the Car Assembly Line
Autor: Pulido, Raul Garcia-Sánchez, Álvaro Ortega-Mier, Miguel Brun, Asessandro
Fecha difusión:
Resumen:
[EN] The inbound logistic for feeding the workstation inside the factory represents a critical issue in the car manufacturing industry. Nowadays, this issue is even more critical than in the past since more types of car ...[+]
Palabras clave: Integer Programming , Routing , Inventory , Assembly line
Derechos de uso: Reconocimiento - No comercial (by-nc)
Fuente:
International Journal of Production Management and Engineering. (issn: 2340-5317 ) (eissn: 2340-4876 )
DOI: 10.4995/ijpme.2014.1838
Editorial:
Editorial Universitat Politècnica de València
Versión del editor: https://doi.org/10.4995/ijpme.2014.1838
Tipo: Artículo

References

Archetti, C., Bertazzi, L., Hertz, A., & Speranza, M. G. (2012). A Hybrid Heuristic for an Inventory Routing Problem. INFORMS Journal on Computing, 24(1), 101-116. doi:10.1287/ijoc.1100.0439

Becker, C., & Scholl, A. (2006). A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research, 168(3), 694-715. doi:10.1016/j.ejor.2004.07.023

Czyzyk, J., Mesnier, M. P., & More, J. J. (1998). The NEOS Server. IEEE Computational Science and Engineering, 5(3), 68-75. doi:10.1109/99.714603 [+]
Archetti, C., Bertazzi, L., Hertz, A., & Speranza, M. G. (2012). A Hybrid Heuristic for an Inventory Routing Problem. INFORMS Journal on Computing, 24(1), 101-116. doi:10.1287/ijoc.1100.0439

Becker, C., & Scholl, A. (2006). A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research, 168(3), 694-715. doi:10.1016/j.ejor.2004.07.023

Czyzyk, J., Mesnier, M. P., & More, J. J. (1998). The NEOS Server. IEEE Computational Science and Engineering, 5(3), 68-75. doi:10.1109/99.714603

Dolan, E. D. (2001). NEOS server 4.0 administrative guide. doi:10.2172/822567

Eskigun, E., Uzsoy, R., Preckel, P. V., Beaujon, G., Krishnan, S., & Tew, J. D. (2005). Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers. European Journal of Operational Research, 165(1), 182-206. doi:10.1016/j.ejor.2003.11.029

GHOSH, S., & GAGNON, R. J. (1989). A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research, 27(4), 637-670. doi:10.1080/00207548908942574

Grønhaug, R., Christiansen, M., Desaulniers, G., & Desrosiers, J. (2010). A Branch-and-Price Method for a Liquefied Natural Gas Inventory Routing Problem. Transportation Science, 44(3), 400-415. doi:10.1287/trsc.1100.0317

Jin, M., Luo, Y., & Eksioglu, S. D. (2008). Integration of production sequencing and outbound logistics in the automotive industry. International Journal of Production Economics, 113(2), 766-774. doi:10.1016/j.ijpe.2007.11.003

Kaminsky, P., & Simchi-Levi, D. (2003). Production and Distribution Lot Sizing in a Two Stage Supply Chain. IIE Transactions, 35(11), 1065-1075. doi:10.1080/07408170304401

Kazemi, S. M., Ghodsi, R., Rabbani, M., & Tavakkoli-Moghaddam, R. (2011). A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks. The International Journal of Advanced Manufacturing Technology, 55(9-12), 1111-1122. doi:10.1007/s00170-010-3120-6

Laporte, G. (1992). The vehicle routing problem: An overview of exact and approximate algorithms. European Journal of Operational Research, 59(3), 345-358. doi:10.1016/0377-2217(92)90192-c

Moin, N. H., Salhi, S., & Aziz, N. A. B. (2011). An efficient hybrid genetic algorithm for the multi-product multi-period inventory routing problem. International Journal of Production Economics, 133(1), 334-343. doi:10.1016/j.ijpe.2010.06.012

Monden Y (1983), Toyota production system: practical approach to production management, Industrial Engineering and Management Press, Institute of Industrial Engineers Norcross, GA.

Prajogo, D., & Olhager, J. (2012). Supply chain integration and performance: The effects of long-term relationships, information technology and sharing, and logistics integration. International Journal of Production Economics, 135(1), 514-522. doi:10.1016/j.ijpe.2011.09.001

Régin, J.-C., & Puget, J.-F. (1997). A filtering algorithm for global sequencing constraints. Lecture Notes in Computer Science, 32-46. doi:10.1007/bfb0017428

Volling, T., Matzke, A., Grunewald, M., & Spengler, T. S. (2013). Planning of capacities and orders in build-to-order automobile production: A review. European Journal of Operational Research, 224(2), 240-260. doi:10.1016/j.ejor.2012.07.034

[-]

recommendations

 

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro completo del ítem