Mostrar el registro sencillo del ítem
dc.contributor.author | Pulido, Raul | es_ES |
dc.contributor.author | Garcia-Sánchez, Álvaro | es_ES |
dc.contributor.author | Ortega-Mier, Miguel | es_ES |
dc.contributor.author | Brun, Asessandro | es_ES |
dc.date.accessioned | 2014-01-23T08:25:15Z | |
dc.date.available | 2014-01-23T08:25:15Z | |
dc.date.issued | 2014-01-13 | |
dc.identifier.issn | 2340-5317 | |
dc.identifier.uri | http://hdl.handle.net/10251/35024 | |
dc.description.abstract | [EN] The inbound logistic for feeding the workstation inside the factory represents a critical issue in the car manufacturing industry. Nowadays, this issue is even more critical than in the past since more types of car are being produced in the assembly lines. Consequently, as workstations have to install many types of components, they also need to have an inventory of different types of the component in a compact space. The replenishment is a critical issue since a lack of inventory could cause line stoppage or reworking. On the other hand, an excess of inventory could increase the holding cost or even block the replenishment paths. The decision of the replenishment routes cannot be made without taking into consideration the inventory needed by each station during the production time which will depend on the production sequence. This problem deals with medium-sized instances and it is solved using online solvers. The contribution of this paper is a MILP for the replenishment and inventory of the components in a car assembly line. | es_ES |
dc.language | Inglés | es_ES |
dc.publisher | Editorial Universitat Politècnica de València | |
dc.relation.ispartof | International Journal of Production Management and Engineering | |
dc.rights | Reconocimiento - No comercial (by-nc) | es_ES |
dc.subject | Integer Programming | es_ES |
dc.subject | Routing | es_ES |
dc.subject | Inventory | es_ES |
dc.subject | Assembly line | es_ES |
dc.title | MILP for the Inventory and Routing for Replenishment Problem in the Car Assembly Line | es_ES |
dc.type | Artículo | es_ES |
dc.date.updated | 2014-01-23T08:14:14Z | |
dc.identifier.doi | 10.4995/ijpme.2014.1838 | |
dc.rights.accessRights | Abierto | es_ES |
dc.description.bibliographicCitation | Pulido, R.; Garcia-Sánchez, Á.; Ortega-Mier, M.; Brun, A. (2014). MILP for the Inventory and Routing for Replenishment Problem in the Car Assembly Line. International Journal of Production Management and Engineering. 2(1):37-45. https://doi.org/10.4995/ijpme.2014.1838 | es_ES |
dc.description.accrualMethod | SWORD | es_ES |
dc.relation.publisherversion | https://doi.org/10.4995/ijpme.2014.1838 | es_ES |
dc.description.upvformatpinicio | 37 | es_ES |
dc.description.upvformatpfin | 45 | es_ES |
dc.description.volume | 2 | |
dc.description.issue | 1 | |
dc.identifier.eissn | 2340-4876 | |
dc.description.references | Archetti, C., Bertazzi, L., Hertz, A., & Speranza, M. G. (2012). A Hybrid Heuristic for an Inventory Routing Problem. INFORMS Journal on Computing, 24(1), 101-116. doi:10.1287/ijoc.1100.0439 | es_ES |
dc.description.references | Becker, C., & Scholl, A. (2006). A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research, 168(3), 694-715. doi:10.1016/j.ejor.2004.07.023 | es_ES |
dc.description.references | Czyzyk, J., Mesnier, M. P., & More, J. J. (1998). The NEOS Server. IEEE Computational Science and Engineering, 5(3), 68-75. doi:10.1109/99.714603 | es_ES |
dc.description.references | Dolan, E. D. (2001). NEOS server 4.0 administrative guide. doi:10.2172/822567 | es_ES |
dc.description.references | Eskigun, E., Uzsoy, R., Preckel, P. V., Beaujon, G., Krishnan, S., & Tew, J. D. (2005). Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers. European Journal of Operational Research, 165(1), 182-206. doi:10.1016/j.ejor.2003.11.029 | es_ES |
dc.description.references | GHOSH, S., & GAGNON, R. J. (1989). A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research, 27(4), 637-670. doi:10.1080/00207548908942574 | es_ES |
dc.description.references | Grønhaug, R., Christiansen, M., Desaulniers, G., & Desrosiers, J. (2010). A Branch-and-Price Method for a Liquefied Natural Gas Inventory Routing Problem. Transportation Science, 44(3), 400-415. doi:10.1287/trsc.1100.0317 | es_ES |
dc.description.references | Jin, M., Luo, Y., & Eksioglu, S. D. (2008). Integration of production sequencing and outbound logistics in the automotive industry. International Journal of Production Economics, 113(2), 766-774. doi:10.1016/j.ijpe.2007.11.003 | es_ES |
dc.description.references | Kaminsky, P., & Simchi-Levi, D. (2003). Production and Distribution Lot Sizing in a Two Stage Supply Chain. IIE Transactions, 35(11), 1065-1075. doi:10.1080/07408170304401 | es_ES |
dc.description.references | Kazemi, S. M., Ghodsi, R., Rabbani, M., & Tavakkoli-Moghaddam, R. (2011). A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks. The International Journal of Advanced Manufacturing Technology, 55(9-12), 1111-1122. doi:10.1007/s00170-010-3120-6 | es_ES |
dc.description.references | Laporte, G. (1992). The vehicle routing problem: An overview of exact and approximate algorithms. European Journal of Operational Research, 59(3), 345-358. doi:10.1016/0377-2217(92)90192-c | es_ES |
dc.description.references | Moin, N. H., Salhi, S., & Aziz, N. A. B. (2011). An efficient hybrid genetic algorithm for the multi-product multi-period inventory routing problem. International Journal of Production Economics, 133(1), 334-343. doi:10.1016/j.ijpe.2010.06.012 | es_ES |
dc.description.references | Monden Y (1983), Toyota production system: practical approach to production management, Industrial Engineering and Management Press, Institute of Industrial Engineers Norcross, GA. | es_ES |
dc.description.references | Prajogo, D., & Olhager, J. (2012). Supply chain integration and performance: The effects of long-term relationships, information technology and sharing, and logistics integration. International Journal of Production Economics, 135(1), 514-522. doi:10.1016/j.ijpe.2011.09.001 | es_ES |
dc.description.references | Régin, J.-C., & Puget, J.-F. (1997). A filtering algorithm for global sequencing constraints. Lecture Notes in Computer Science, 32-46. doi:10.1007/bfb0017428 | es_ES |
dc.description.references | Volling, T., Matzke, A., Grunewald, M., & Spengler, T. S. (2013). Planning of capacities and orders in build-to-order automobile production: A review. European Journal of Operational Research, 224(2), 240-260. doi:10.1016/j.ejor.2012.07.034 | es_ES |