dc.description.abstract | [EN] A novel scheduling problem that results from the addition of resource-assignable setups is presented in this paper. We consider an unrelated parallel machine problem with machine and job sequence-dependent setup times. The new characteristic is that the amount of setup time does not only depend on the machine and job sequence but also on the amount of resources assigned, which can vary between a minimum and a maximum. The aim is to give solution to real problems arising in several industries where frequent setup operations in production lines have to be carried out. These operations are indeed setups whose length can be reduced or extended according to the amount of resources assigned to them. The objective function considered is a linear combination of total completion time and the total amount of resources assigned. We present a mixed integer program (MIP) model and some fast dispatching heuristics. We carry out careful and comprehensive statistical analyses to study what characteristics of the problem affect the MIP model performance. We also study the effectiveness of the different heuristics proposed. © 2011 Springer-Verlag London Limited. | es_ES |
dc.description.sponsorship | The authors are indebted to the referees and editor for a close examination of the paper, which has increased its quality and presentation. This work is partially funded by the Spanish Ministry of Science and Innovation, under the project "SMPA-Advanced Parallel Multiobjective Sequencing: Practical and Theoretical Advances" with reference DPI2008-03511/DPI. The authors should also thank the IMPIVA-Institute for the Small and Medium Valencian Enterprise, for the project OSC with references IMIDIC/2008/137, IMIDIC/2009/198, and IMIDIC/2010/175. | |
dc.language | Inglés | es_ES |
dc.publisher | Springer Verlag (Germany) | es_ES |
dc.relation.ispartof | International Journal of Advanced Manufacturing Technology | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Resources | es_ES |
dc.subject | Scheduling | es_ES |
dc.subject | Sequence-dependent setups | es_ES |
dc.subject | Total completion time | es_ES |
dc.subject | Unrelated parallel machines | es_ES |
dc.subject | Job sequences | es_ES |
dc.subject | Linear combinations | es_ES |
dc.subject | Mixed-integer programs | es_ES |
dc.subject | Model performance | es_ES |
dc.subject | Objective functions | es_ES |
dc.subject | Production line | es_ES |
dc.subject | Real problems | es_ES |
dc.subject | Scheduling problem | es_ES |
dc.subject | Sequence dependent setups | es_ES |
dc.subject | Sequence-dependent setup time | es_ES |
dc.subject | Set-up time | es_ES |
dc.subject | Integer programming | es_ES |
dc.subject.classification | ESTADISTICA E INVESTIGACION OPERATIVA | es_ES |
dc.subject.classification | ORGANIZACION DE EMPRESAS | es_ES |
dc.title | Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times | es_ES |
dc.type | Artículo | es_ES |
dc.embargo.lift | 10000-01-01 | |
dc.embargo.terms | forever | es_ES |
dc.identifier.doi | 10.1007/S00170-011-3318-2 | |
dc.relation.projectID | info:eu-repo/grantAgreement/GVA//IMIDIC%2F2008%2F137/ | es_ES |
dc.relation.projectID | info:eu-repo/grantAgreement/MICINN//DPI2008-03511/ES/SMPA: SECUENCIACION MULTIOBJETIVO PARALELA AVANZADA: AVANCES TEORICOS Y PRACTICOS/ | es_ES |
dc.relation.projectID | info:eu-repo/grantAgreement/Generalitat Valenciana//IMIDIC%2F2009%2F198/ES/OSC: Optimización integral de la cadena de suministro/ / | |
dc.relation.projectID | info:eu-repo/grantAgreement/GVA//IMIDIC%2F2010%2F175/ | |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Estadística e Investigación Operativa Aplicadas y Calidad - Departament d'Estadística i Investigació Operativa Aplicades i Qualitat | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Organización de Empresas - Departament d'Organització d'Empreses | es_ES |
dc.description.bibliographicCitation | Ruiz García, R.; Andrés Romano, C. (2011). Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times. International Journal of Advanced Manufacturing Technology. 57(5):777-794. https://doi.org/10.1007/S00170-011-3318-2 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.publisherversion | http://dx.doi.org/10.1007/s00170-011-3318-2 | es_ES |
dc.description.upvformatpinicio | 777 | es_ES |
dc.description.upvformatpfin | 794 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 57 | es_ES |
dc.description.issue | 5 | es_ES |
dc.relation.senia | 214894 | |
dc.contributor.funder | Ministerio de Ciencia e Innovación | |
dc.contributor.funder | Instituto de la Pequeña y Mediana Industria de la Generalitat Valenciana | |
dc.description.references | Allahverdi A, Gupta JND, Aldowaisan T (1999) A review of scheduling research involving setup considerations. OMEGA Int J Manag Sci 27(2):219–239 | es_ES |
dc.description.references | Allahverdi A, Ng CT, Cheng TCE, Kovalyov MY (2008) A survey of scheduling problems with setup times or costs. Eur J Oper Res 187(3):985–1032 | es_ES |
dc.description.references | Balakrishnan N, Kanet JJ, Sridharan SV (1999) Early/tardy scheduling with sequence dependent setups on uniform parallel machines. Comput Oper Res 26(2):127–141 | es_ES |
dc.description.references | Biggs D, De Ville B, and Suen E (1991) A method of choosing multiway partitions for classification and decision trees. J Appl Stat 18(1):49–62 | es_ES |
dc.description.references | Chen J-F (2006) Unrelated parallel machine scheduling with secondary resource constraints. Int J Adv Manuf Technol 26(3):285–292 | es_ES |
dc.description.references | Cheng TCE, Sin CCS (1990) A state-of-the-art review of parallel machine scheduling research. Eur J Oper Res 47(3):271–292 | es_ES |
dc.description.references | Graham RL, Lawler EL, Lenstra JK, Rinnooy Kan AHG (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann Discrete Math 5:287–326 | es_ES |
dc.description.references | Grigoriev E, Sviridenko M, Uetz M (2007) Unrelated parallel machine scheduling with resource dependent processing times. Math Program Ser A and B 110(1):209–228 | es_ES |
dc.description.references | Guinet A (1991) Textile production systems: a succession of non-identical parallel processor shops. J Oper Res Soc 42(8):655–671 | es_ES |
dc.description.references | Guinet A, Dussauchoy A (1993) Scheduling sequence dependent jobs on identical parallel machines to minimize completion time criteria. Int J Prod Res 31(7):1579–1594 | es_ES |
dc.description.references | Horn WA (1973) Minimizing average flow time with parallel machines. Oper Res 21(3):846–847 | es_ES |
dc.description.references | Kass GV (1980) An exploratory technique for investigating large quantities of categorical data. Appl Stat 29(2):119–127 | es_ES |
dc.description.references | Kim DW, Kim KH, Jang W, Chen FF (2002) Unrelated parallel machine scheduling with setup times using simulated annealing. Robot Comput-Integr Manuf 18(3–4):223–231 | es_ES |
dc.description.references | Lam K, Xing W (1997) New trends in parallel machine scheduling. Int J Oper Prod Manage 17(3):326–338 | es_ES |
dc.description.references | Lee YH, Pinedo M (1997) Scheduling jobs on parallel machines with sequence dependent setup times. Eur J Oper Res 100(3):464–474 | es_ES |
dc.description.references | Marsh JD, Montgomery DC (1973) Optimal procedures for scheduling jobs with sequence-dependent changeover times on parallel processors. AIIE Technical Papers, pp 279–286 | es_ES |
dc.description.references | Mokotoff E (2001) Parallel machine scheduling problems: a survey. Asia-Pac J Oper Res 18(2):193–242 | es_ES |
dc.description.references | Morgan JA, Sonquist JN (1963) Problems in the analysis of survey data and a proposal. J Am Stat Assoc 58:415–434 | es_ES |
dc.description.references | Ng CT, Edwin Cheng TC, Janiak A, Kovalyov MY (2005) Group scheduling with controllable setup and processing times: minimizing total weighted completion time. Ann Oper Res 133:163–174 | es_ES |
dc.description.references | Nowicki E, Zdrzalka S (1990) A survey of results for sequencing problems with controllable processing times. Discrete Appl Math 26(2–3):271–287 | es_ES |
dc.description.references | Pinedo M (2002) Scheduling: theory, algorithms, and systems, 2nd edn. Prentice Hall, Upper Saddle | es_ES |
dc.description.references | Rabadi G, Moraga RJ, Al-Salem A (2006) Heuristics for the unrelated parallel machine scheduling problem with setup times. J Intell Manuf 17(1):85–97 | es_ES |
dc.description.references | Radhakrishnan S, Ventura JA (2000) Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times. Int J Prod Res 38(10):2233–2252 | es_ES |
dc.description.references | Ruiz R, Sivrikaya Şerifoğlu F, Urlings T (2008) Modeling realistic hybrid flexible flowshop scheduling problems. Comput Oper Res 35(4):1151–1175 | es_ES |
dc.description.references | Sivrikaya-Serifoglu F, Ulusoy G (1999) Parallel machine scheduling with earliness and tardiness penalties. Comput Oper Res 26(8):773–787 | es_ES |
dc.description.references | Webster ST (1997) The complexity of scheduling job families about a common due date. Oper Res Lett 20(2):65–74 | es_ES |
dc.description.references | Weng MX, Lu J, Ren H (2001) Unrelated parallel machines scheduling with setup consideration and a total weighted completion time objective. Int J Prod Econ 70(3):215–226 | es_ES |
dc.description.references | Yang W-H, Liao C-J (1999) Survey of scheduling research involving setup times. Int J Syst Sci 30(2):143–155 | es_ES |
dc.description.references | Zhang F, Tang GC, Chen ZL (2001) A 3/2-approximation algorithm for parallel machine scheduling with controllable processing times. Oper Res Lett 29(1):41–47 | es_ES |
dc.description.references | Zhu Z, Heady R (2000) Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach. Comput Ind Eng 38(2):297–305 | es_ES |