Mostrar el registro sencillo del ítem
dc.contributor.advisor | Cárcel Carrasco, Francisco Javier | es_ES |
dc.contributor.author | Esteve Bañuls, Nuria | es_ES |
dc.date.accessioned | 2014-11-26T14:27:04Z | |
dc.date.available | 2014-11-26T14:27:04Z | |
dc.date.created | 2014-09 | |
dc.date.issued | 2014-11-26T14:27:04Z | |
dc.identifier.uri | http://hdl.handle.net/10251/44897 | |
dc.description.abstract | [ES] El objetivo del presente proyecto es definir y establecer las condiciones para ejecutar las obras de urbanización de viales y zonas verdes así como la construcción de las redes de alcantarillado, de distribución de telefonía, agua potable, energía eléctrica y alumbrado público de la UE II del área Terranova de la Playa de Oliva, para lo cual se redactan los documentos necesarios para acometer las obras de: Movimientos de tierra para la construcción de la caja del pavimento de calzada y aceras; ejecución de los firmes de calzada y aceras; ejecución de la red general de saneamiento, así como las conexiones con cada una de las parcelas edificables y con la red general de la playa de Oliva; ejecución de la red de evacuación de aguas pluviales; ejecución de la red de distribución de agua potable, así como la acometida a cada una de las parcelas edificables, y la conexión con la red de abastecimiento general de la playa de Oliva; ejecución de la red de riego de las zonas verdes; ejecución de la red de distribución de telefonía, así como la acometida a cada una de las parcelas edificables y de conexión con la red de alimentación de Telefónica; ejecución de la red instalación eléctrica, así como la acometida a cada una de las parcelas edificables y de conexión con la red de alimentación de Iberdrola; ejecución de la red de alumbrado público; ejecución de las obras necesarias para la urbanización de la zona verde y espacios libres de la unidad de ejecución. Para la redacción del presente proyecto se ha realizado un estudio previo mediante la recopilación de información técnica del departamento de urbanismo del Ayuntamiento de Oliva, así como varias visitas “in situ” para comprobar el estado actual del sector afectado así como de los adyacentes, verificando las conexiones existentes próximas a la misma y la viabilidad para su utilización. Actualmente la zona se encuentra edificada mediante viviendas unifamiliares aisladas, es por lo que, en base a toda la información recogida se ha buscado la solución técnica más adecuada a las necesidades de la zona y se ha redactado cada uno de los documentos del presente proyecto. | es_ES |
dc.description.abstract | [EN] The purpose of this project is to define and establish the conditions for executing the development works of roads and green areas and the construction of sewerage networks, telephony distribution, potable water, electricity and public lighting of UE II Terranova area of Oliva Beach, for which the necessary documents are drafted to undertake the works of: Earthworks for building case roadway pavement and sidewalks; implementation of road pavements and sidewalks; implementation of general sewage, as well as connections with each of the building plots and general network Oliva Beach; implementation of the distribution of potable water and rush to each of the building plots, and the network connection in the general supply of Oliva beach; implementation of the irrigation of green areas; implementation of the distribution network telephony and rush to each building plots and connection to mains Telefonica; running network wiring and the connection to each of the building plots and connection to mains Iberdrola; running the street lighting network and implementation of measures necessary for the development of green and free spaces execution unit works. For the preparation of this project has made a previous study by collecting technical information from the planning department of the City Hall of Oliva and several "on site" visits to check the current status of the sector concerned and the adjacent, verifying the connections close to the same and viability for use. Based on all the information gathered it has been sought the most appropriate technical solution to the needs of the area and based on that, each of the documents for this project has been drafted. | es_ES |
dc.format.extent | 315 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Sewerage | es_ES |
dc.subject | Red de telefonía | es_ES |
dc.subject | Red de saneamiento | es_ES |
dc.subject | Green areas | es_ES |
dc.subject | Urbanism | es_ES |
dc.subject | Electric Installation | es_ES |
dc.subject | Water facilities | es_ES |
dc.subject | Zonas verdes | es_ES |
dc.subject | Proyecto de urbanización | es_ES |
dc.subject | Instalaciones eléctricas | es_ES |
dc.subject | Instalaciones de agua | es_ES |
dc.subject | Instalaciones de alumbrado exterior | es_ES |
dc.subject | Urbanismo | es_ES |
dc.subject.classification | CONSTRUCCIONES ARQUITECTONICAS | es_ES |
dc.subject.other | Grado en Ingeniería de Edificación-Grau en Enginyeria d'Edificació | es_ES |
dc.title | Proyecto de Urbanización Terranova II. Oliva (Valencia) | es_ES |
dc.type | Proyecto/Trabajo fin de carrera/grado | es_ES |
dc.rights.accessRights | Cerrado | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Gestión en la Edificación - Escola Tècnica Superior de Gestió en l'Edificació | es_ES |
dc.description.bibliographicCitation | Esteve Bañuls, N. (2014). Proyecto de Urbanización Terranova II. Oliva (Valencia). http://hdl.handle.net/10251/44897. | es_ES |
dc.description.accrualMethod | Archivo delegado | es_ES |