- -

Three Discussions from the September/October 2012 ACI Structural Journal : Repair of Corroded Prestressed Concrete Piles of Harbor Landing Stages

RiuNet: Institutional repository of the Polithecnic University of Valencia

Share/Send to

Cited by

Statistics

Three Discussions from the September/October 2012 ACI Structural Journal : Repair of Corroded Prestressed Concrete Piles of Harbor Landing Stages

Show full item record

Martí Vargas, JR. (2013). Three Discussions from the September/October 2012 ACI Structural Journal : Repair of Corroded Prestressed Concrete Piles of Harbor Landing Stages. Structural Journal. 110(4):707-708. https://doi.org/10.14359/51685755

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/49593

Files in this item

Item Metadata

Title: Three Discussions from the September/October 2012 ACI Structural Journal : Repair of Corroded Prestressed Concrete Piles of Harbor Landing Stages
Author:
UPV Unit: Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil
Issued date:
Abstract:
Repair of Corroded Prestressed Concrete Piles of Harbor Landing Stages. Paper by Tseng-Cheng Lin, Chyuan-Hwan Jeng, Chung-Yue Wang, and Ting-Hung Jou Discussion by José R. Martí-Vargas
Copyrigths: Reserva de todos los derechos
Source:
Structural Journal. (eissn: 0889-3241 )
DOI: 10.14359/51685755
Publisher:
American Concrete Institute
Publisher version: http://dx.doi.org/10.14359/51685755
Type: Reseña

This item appears in the following Collection(s)

Show full item record