Mostrar el registro sencillo del ítem
dc.contributor.advisor | Fuentes Giner, María Begoña![]() |
es_ES |
dc.contributor.advisor | Hajdu, Miklós![]() |
es_ES |
dc.contributor.author | Redondo Rodríguez, Carles![]() |
es_ES |
dc.date.accessioned | 2015-05-08T13:11:40Z | |
dc.date.available | 2015-05-08T13:11:40Z | |
dc.date.created | 2014-07-07 | |
dc.date.issued | 2015-05-08 | |
dc.identifier.uri | http://hdl.handle.net/10251/49955 | |
dc.description.abstract | Trabajo Fin de Grado en modalidad de Intercambios Académicos : Szent István University. Faculty of Architecture and Civil Engineering (Hungary) | es_ES |
dc.description.abstract | [EN] In this project I intended to do a detailed analysis of the legal process necessary for contracting of public works, in (Spain) and Budapest (Hungary). Mentioned analysis I used to develop a guideline of legal steps that must be followed in order to hire a building contractor to start a project. To make the above, I had to study both laws. During this study I have focused particularly on the Spanish Public Sector Contracts Law due to project requirements. As for the Hungarian law I have read and have extracted some differences, although due to the two was under European directives, are more similarities than differences between the two. Contracts with public administrations in both countries are basically divided into those that are subject to directives of the European Union and those who are not, these differ essentially budget thresholds. The processes outlined in the first paragraph that are schematized in Annex, are the procedures to be followed for the award of a public contract. In Spain there are four procedures, two regular and two extraordinary, and depending on the type of contract, the terms of this or the budget allocated to it, one procedure or another will be chosen. | es_ES |
dc.format.extent | 54 | es_ES |
dc.language | Inglés | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Administración pública | es_ES |
dc.subject | Contratos de obras públicas | es_ES |
dc.subject | Public administration | es_ES |
dc.subject | Construction contracts | es_ES |
dc.subject.classification | CONSTRUCCIONES ARQUITECTONICAS | es_ES |
dc.subject.other | Grado en Arquitectura Técnica-Grau en Arquitectura Tècnica | es_ES |
dc.title | Management of the legal process necessary for contracting of public works | es_ES |
dc.type | Proyecto/Trabajo fin de carrera/grado | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Gestión en la Edificación - Escola Tècnica Superior de Gestió en l'Edificació | es_ES |
dc.description.bibliographicCitation | Redondo Rodriguez, C. (2014). Management of the legal process necessary for contracting of public works. http://hdl.handle.net/10251/49955. | es_ES |
dc.description.accrualMethod | Archivo delegado | es_ES |