Mostrar el registro sencillo del ítem
dc.contributor.advisor | Escuder Bueno, Ignacio | es_ES |
dc.contributor.author | Cervera Miquel, Daniel | es_ES |
dc.date.accessioned | 2015-11-02T09:56:33Z | |
dc.date.available | 2015-11-02T09:56:33Z | |
dc.date.created | 2015-06-15 | |
dc.date.issued | 2015-11-02 | |
dc.identifier.uri | http://hdl.handle.net/10251/56836 | |
dc.description.abstract | [ES] El presente Trabajo Final de Grado consiste en el Estudio de Soluciones de infraestructuras de control y laminación de avenidas en la cuenca del río Girona. Dicho proyecto se sitúa sobre los Términos Municipales de Orba y Vall de Laguar (Alicante - España). El trabajo toma como documento de partida el Plan Director de defensa contra las Avenidas de la Comarca de la Marina Alta donde se proponen una serie de medidas para paliar la problemática que causan las avenidas en el río Girona, entre las que destacan la construcción de una presa de laminación, zonas de inundación controlada y una adecuación del cauce. Después de un análisis multicriterio se determina que la actuación más efectiva es la presa de laminación. Para dimensionar correctamente la presa se realiza un estudio geológico - geotécnico y un estudio de avenidas. Con los datos de ambos estudios se localizan tres posibles emplazamientos de la presa, de los cuales por criterios topográficos y medioambientales se elige el más oriental. Después de un estudio de alternativas se decide el proyecto de una presa de hormigón vibrado. La presa proyectada es una presa agujero de gravedad de planta recta de 59.6 metros de altura y 318.3 metros de longitud que cuenta con tres órganos de alivio: dos conducciones gemelas sin compuerta como desagüe de fondo y dos aliviaderos superiores a distintas cotas para producir una mayor laminación. Con objeto de evaluar la efectividad de la presa se realiza un análisis de laminación y un análisis de vulnerabilidad y riesgo donde se observa que el riesgo disminuye en más de un 40%. | es_ES |
dc.description.abstract | [CA] El present Treball Final de Grau consisteix en l'estudi de solucions d'infraestructures de control i laminació d'avingudes a la conca del riu Girona. L'esmentat projecte es situa als termes municipals d'Orba i Vall de Laguar (Alacant - Espanya). El treball pren com a document de partida el Pla Director de defensa contra les Avingudes de la comarca de la Marina Alta, on es proposa una sèrie de mesures per a pal·liar la problemàtica que causen les avingudes al riu Girona, entres les que destaquen la construcció d'una presa de laminació, zones d'inundació controlada i una adequació del llit. Després d'un anàlisi multicriteri es determina que l'actuació més efectiva es la presa de laminació. Per a dimensionar correctament la presa es realitza un estudi geològic - geotècnic y un estudi de crescudes. Amb les dades de ambdós estudis es localitzen tres possibles emplaçaments de la presa, dels quals per mitja de criteris topogràfics i mediambientals s'elegeix el més oriental. Després d'un estudi d'alternatives es decideix el projecte d'una presa de formigó vibrat. La presa projectada es una presa forat de gravetat de planta recta de 59.6 metres d'alçada i 318.3 metres de longitud que conta amb tres òrgans d'alleujament: dos conduccions bessones sense comportes com a desguàs de fons y dos sobreeixidors superiores a distints nivells per a produir una major laminació. Amb objecte d'avaluar l'efectivitat de la presa es realitza un anàlisi de laminació i un anàlisis de vulnerabilitat i risc on s'observa que el risc disminueix en més d'un 40%. | es_ES |
dc.description.abstract | [EN] This Final Project is the study of flood control infrastructure solutions in the Girona river basin. The project is located on the towns of Orba and Vall de Laguar (Alicante ‘ Spain). The study takes as starting document the ‘Plan Director de defensa contra las Avenidas de la Comarca de la Marina Alta’ where proposed a list of works to reduce the problems caused by floods in the Girona river, among which the construction of a flood control dam, controlled flooding areas and an adaptation of the channel. A multi-criteria analysis determines that the most effective action is flood control dam. Geological - geotechnical and flood studies are needed for correct dimensioning of the dam. With data from both studies three possible locations of the dam have been studied, which is located topographic and environmental criteria for choosing the easternmost. After a study of the proposed alternatives, vibrated concrete dam is decided. The projected dam is a hole gravity dam of 59.6 meters high and 318.3 meters long with three spillways: two twin pipes without gates as bottom outlet and two spillways without gates at top. To evaluate the effectiveness of the dam is done a flood control analysis and risk analysis which shows that the risk decreases by more than 40%. | es_ES |
dc.format.extent | 46 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Soluciones | es_ES |
dc.subject | Avenidas | es_ES |
dc.subject | Laminación | es_ES |
dc.subject | Presa | es_ES |
dc.subject | Aliviadero | es_ES |
dc.subject | Agujero | es_ES |
dc.subject | Riesgo | es_ES |
dc.subject | Hidrologia | es_ES |
dc.subject | Crecidas | es_ES |
dc.subject | Dimensionamiento | es_ES |
dc.subject | Solucions | es_ES |
dc.subject | Avingudes | es_ES |
dc.subject | Laminació | es_ES |
dc.subject | Sobreeixidor | es_ES |
dc.subject | Forat | es_ES |
dc.subject | Risc | es_ES |
dc.subject | Crescudes | es_ES |
dc.subject | Dimensionament | es_ES |
dc.subject | Solutions | es_ES |
dc.subject | Flood | es_ES |
dc.subject | Lamination | es_ES |
dc.subject | Dam | es_ES |
dc.subject | Spillway | es_ES |
dc.subject | Hole | es_ES |
dc.subject | Risk | es_ES |
dc.subject | Hydrology | es_ES |
dc.subject | Sizing | es_ES |
dc.subject.classification | INGENIERIA HIDRAULICA | es_ES |
dc.subject.other | Grado en Ingeniería de Obras Públicas-Grau en Enginyeria d'Obres Públiques | es_ES |
dc.title | Estudio de soluciones para el proyecto de infraestructuras de control y laminación de avenidas en la cuenca del río Girona (Alicante) | es_ES |
dc.type | Proyecto/Trabajo fin de carrera/grado | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos - Escola Tècnica Superior d'Enginyers de Camins, Canals i Ports | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería Hidráulica y Medio Ambiente - Departament d'Enginyeria Hidràulica i Medi Ambient | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Instituto Universitario de Ingeniería del Agua y del Medio Ambiente - Institut Universitari d'Enginyeria de l'Aigua i Medi Ambient | es_ES |
dc.description.bibliographicCitation | Cervera Miquel, D. (2015). Estudio de soluciones para el proyecto de infraestructuras de control y laminación de avenidas en la cuenca del río Girona (Alicante). http://hdl.handle.net/10251/56836. | es_ES |
dc.description.accrualMethod | Archivo delegado | es_ES |