- -

Climate and construction delays: case study in Chile

RiuNet: Institutional repository of the Polithecnic University of Valencia

Share/Send to

Cited by

Statistics

Climate and construction delays: case study in Chile

Show full item record

Ballesteros Pérez, P.; Del Campo-Hitschfeld, ML.; Gonzalez-Naranjo, MA.; González-Cruz, MC. (2015). Climate and construction delays: case study in Chile. Engineering, Construction and Architectural Management. 22(6):596-621. doi:10.1108/ECAM-02-2015-0024

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/65272

Files in this item

Item Metadata

Title: Climate and construction delays: case study in Chile
Author:
UPV Unit: Universitat Politècnica de València. Departamento de Proyectos de Ingeniería - Departament de Projectes d'Enginyeria
Issued date:
Abstract:
Purpose - Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The purpose of this paper is to analyze ...[+]
Subjects: Planning , Construction management , Productivity rate , Data analysis , Decision support systems , Construction works
Copyrigths: Reserva de todos los derechos
Source:
Engineering, Construction and Architectural Management. (issn: 0969-9988 ) (eissn: 1365-232X )
DOI: 10.1108/ECAM-02-2015-0024
Publisher:
Emerald
Publisher version: http://dx.doi.org/10.1108/ECAM-02-2015-0024
Type: Artículo

This item appears in the following Collection(s)

Show full item record