Mostrar el registro sencillo del ítem
dc.contributor.advisor | Oliver Faubel, Inmaculada | es_ES |
dc.contributor.advisor | Fuentes Giner, María Begoña | es_ES |
dc.contributor.author | García García, Alejandro | es_ES |
dc.coverage.spatial | east=-0.4682969; north=39.3851625; name=Carrer Aljub de Sant Ramón, 12, 46220 Picassent, Valencia, Espanya | |
dc.date.accessioned | 2017-09-08T12:33:05Z | |
dc.date.available | 2017-09-08T12:33:05Z | |
dc.date.created | 2017-07-14 | |
dc.date.issued | 2017-09-08 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/86848 | |
dc.description.abstract | [ES] El presente Trabajo Final de Grado consiste en el análisis BIM de un proyecto de ejecución de dos viviendas pareadas ubicadas en el barrio San Ramón de Picassent. Las viviendas, simétrica una con la otra, están compuestas de dos plantas y tienen una superficie total construida de 254 metros cuadrados. El proyecto ha sido elaborado por el estudio de arquitectura intra2. Para su elaboración, el trabajo se divide en tres tareas principales: en la primera tarea se desarrolla un modelo tridimensional BIM 3D en un software BIM. Para la realización de esta tarea se utiliza el software ArchiCAD 19 de Graphisoft. En la segunda tarea, el objetivo es la búsqueda de incongruencias e incoherencias del proyecto que surgen al realizar el modelo tridimensional, adelantándose a posibles fallos futuros que pudieran surgir en obra frutos de estas incidencias y adaptando soluciones a estos proporcionando un mayor margen de actuación ante posibles adversidades. La detección de fallos durante la obra genera un retraso del plazo y un aumento del coste de la obra, por lo que la búsqueda de incidencias durante el análisis BIM es primordial para solventar ambos problemas. Para finalizar, en la tercera tarea se realiza el modelado BIM 4D del proyecto en un software BIM, vinculando el orden de ejecución de las actividades de obra del proyecto (programación de obra) con el modelo BIM 3D, pudiendo realizar una simulación de la construcción de la obra. Para el caso se empleará el software Autodesk Navisworks Manage 2016. | es_ES |
dc.description.abstract | [EN] This Final Project is the BIM analysis of a project execution of two semidetached houses located in the district San Ramon of Picassent. The house, symmetrical with each other, are composed of two floors and have a total floor area of 254 square meters. The project was developed by the study of architecture intra2. For its preparation, the work is divided into three main tasks: the first 3D BIM task a three-dimensional model is developed in a BIM software. To carry out this task Graphisoft ArchiCAD 19 software is used. In the second task, the goal is the search for incongruities and inconsistencies of the project that arise when making the threedimensional model, anticipating possible future failures that could arise because of these incidents and adapting solutions to these providing greater leeway to possible adversities. Fault detection during the work it generates a delay time and an increase in the cost of the work, so the search for incidents during BIM analysis is essential to solve both problems. Finally, in the third task is done modeling BIM 4D project in a BIM software linking the order of execution of work activities of the project (programming work) with 3D BIM model can perform a simulation of the construction of the work. In the case Autodesk Navisworks Manage 2016 software will be used. | es_ES |
dc.format.extent | 170 | es_ES |
dc.language | Español | es_ES |
dc.publisher | Universitat Politècnica de València | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Proyectos de construcción | es_ES |
dc.subject | Gestión de proyectos | es_ES |
dc.subject | Diseño asistido por ordenador | es_ES |
dc.subject | Modelado 3D | es_ES |
dc.subject | Modelado 4D | es_ES |
dc.subject | Sistemas de información en la gestión | es_ES |
dc.subject | Viviendas unifamiliares | es_ES |
dc.subject | Building information modeling | es_ES |
dc.subject | Architecture, Designs and plans | es_ES |
dc.subject | Project management | es_ES |
dc.subject | Computer-aided design | es_ES |
dc.subject | 4D modeling | es_ES |
dc.subject | 3D modeling software | es_ES |
dc.subject | Information resources management | es_ES |
dc.subject | Housing, Single family | es_ES |
dc.subject.classification | CONSTRUCCIONES ARQUITECTONICAS | es_ES |
dc.subject.other | Grado en Arquitectura Técnica-Grau en Arquitectura Tècnica | es_ES |
dc.title | Análisis BIM de un proyecto de ejecución de 2 viviendas pareadas en San Ramón (Picassent) | es_ES |
dc.type | Proyecto/Trabajo fin de carrera/grado | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Escuela Técnica Superior de Gestión en la Edificación - Escola Tècnica Superior de Gestió en l'Edificació | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Construcciones Arquitectónicas - Departament de Construccions Arquitectòniques | es_ES |
dc.description.bibliographicCitation | García García, A. (2017). Análisis BIM de un proyecto de ejecución de 2 viviendas pareadas en San Ramón (Picassent). http://hdl.handle.net/10251/86848. | es_ES |
dc.description.accrualMethod | TFGM | es_ES |
dc.relation.pasarela | TFGM\50426 | es_ES |