Mostrar el registro sencillo del ítem
dc.contributor.author | Aznar, Beltrán | es_ES |
dc.contributor.author | Pellicer Armiñana, Eugenio | es_ES |
dc.contributor.author | Davis, Steven | es_ES |
dc.contributor.author | Ballesteros Pérez, Pablo | es_ES |
dc.date.accessioned | 2017-10-20T07:41:38Z | |
dc.date.available | 2017-10-20T07:41:38Z | |
dc.date.issued | 2017 | es_ES |
dc.identifier.issn | 1392-3730 | es_ES |
dc.identifier.uri | http://hdl.handle.net/10251/89693 | |
dc.description.abstract | [EN] This paper examines the effects of different factors on the success or failure of bids for infrastructure projects in Australia. Logistic regression analysis was used to empirically determine which factors have the largest effect on bidding success. Data was collected from 123 bids submitted by several infrastructure companies with subsidiaries in Australia. The analysis found that having a competitive advantage and a local partner, and also not competing against a local company were the most important factors; as they significantly increase the chances of success. However, four other factors, having relevant expertise, resource availability, a previous relationship with the client, and a previous relationship with consortium members, are `essential¿ to be able to compete; as the absence of any of these four factors results in bid failure, although having them is not a guarantee of success. Results of this paper provide valuable information for any company considering the opportunity of entering into Australia¿s infrastructure market as well as for companies that are already present in that country and are considering whether to bid for a specific project. | es_ES |
dc.language | Inglés | es_ES |
dc.relation.ispartof | Journal of Civil Engineering and Management | es_ES |
dc.rights | Reserva de todos los derechos | es_ES |
dc.subject | Auction | es_ES |
dc.subject | Australia | es_ES |
dc.subject | Bid | es_ES |
dc.subject | Consortium | es_ES |
dc.subject | Contractor | es_ES |
dc.subject | Infrastructure project | es_ES |
dc.subject | International project | es_ES |
dc.subject | Subsidiary company | es_ES |
dc.subject.classification | PROYECTOS DE INGENIERIA | es_ES |
dc.subject.classification | INGENIERIA DEL TERRENO | es_ES |
dc.title | Factors Affecting Contractor's Bidding Success for International Infrastructure Projects in Australia | es_ES |
dc.type | Artículo | es_ES |
dc.identifier.doi | 10.3846/13923730.2017.1341955 | es_ES |
dc.rights.accessRights | Abierto | es_ES |
dc.date.embargoEndDate | 2018-07-13 | es_ES |
dc.contributor.affiliation | Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil | es_ES |
dc.description.bibliographicCitation | Aznar, B.; Pellicer Armiñana, E.; Davis, S.; Ballesteros Pérez, P. (2017). Factors Affecting Contractor's Bidding Success for International Infrastructure Projects in Australia. Journal of Civil Engineering and Management. 23(7):880-889. doi:10.3846/13923730.2017.1341955 | es_ES |
dc.description.accrualMethod | S | es_ES |
dc.relation.publisherversion | http://dx.doi.org/10.3846/13923730.2017.1341955 | es_ES |
dc.description.upvformatpinicio | 880 | es_ES |
dc.description.upvformatpfin | 889 | es_ES |
dc.type.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.description.volume | 23 | es_ES |
dc.description.issue | 7 | es_ES |
dc.relation.pasarela | S\341183 | es_ES |
dc.description.references | Ahmad, I., & Minkarah, I. (1988). Questionnaire Survey on Bidding in Construction. Journal of Management in Engineering, 4(3), 229-243. doi:10.1061/(asce)9742-597x(1988)4:3(229) | es_ES |
dc.description.references | Aje, I. O., Oladinrin, T. O., & Nwaole, A. N. C. (2016). Factors Influencing Success Rate of Contractors in Competitive Bidding for Construction Works in South-East, Nigeria. Journal of Construction in Developing Countries, 21(1), 19-34. doi:10.21315/jcdc2016.21.1.2 | es_ES |
dc.description.references | Asker, J., & Cantillon, E. (2010). Procurement when price and quality matter. The RAND Journal of Economics, 41(1), 1-34. doi:10.1111/j.1756-2171.2009.00088.x | es_ES |
dc.description.references | Ballesteros-Pérez, P., González-Cruz, M. C., Fernández-Diego, M., & Pellicer, E. (2014). ESTIMATING FUTURE BIDDING PERFORMANCE OF COMPETITOR BIDDERS IN CAPPED TENDERS. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 20(5), 702-713. doi:10.3846/13923730.2014.914096 | es_ES |
dc.description.references | Ballesteros-Pérez, P., Skitmore, M., Das, R., & del Campo-Hitschfeld, M. L. (2015). Quick Abnormal-Bid-Detection Method for Construction Contract Auctions. Journal of Construction Engineering and Management, 141(7), 04015010. doi:10.1061/(asce)co.1943-7862.0000978 | es_ES |
dc.description.references | Ballesteros-Pérez, P., Skitmore, M., Pellicer, E., & González-Cruz, M. C. (2015). Scoring rules and abnormally low bids criteria in construction tenders: a taxonomic review. Construction Management and Economics, 33(4), 259-278. doi:10.1080/01446193.2015.1059951 | es_ES |
dc.description.references | Ballesteros-Pérez, P., del Campo-Hitschfeld, M. L., Mora-Melià, D., & Domínguez, D. (2015). Modeling bidding competitiveness and position performance in multi-attribute construction auctions. Operations Research Perspectives, 2, 24-35. doi:10.1016/j.orp.2015.02.001 | es_ES |
dc.description.references | Ballesteros-Pérez, P., Skitmore, M., Pellicer, E., & Gutiérrez-Bahamondes, J. H. (2016). Improving the estimation of probability of bidder participation in procurement auctions. International Journal of Project Management, 34(2), 158-172. doi:10.1016/j.ijproman.2015.11.001 | es_ES |
dc.description.references | Ballesteros-Pérez, P., Skitmore, M., Pellicer, E., & Zhang, X. (2016). Scoring Rules and Competitive Behavior in Best-Value Construction Auctions. Journal of Construction Engineering and Management, 142(9), 04016035. doi:10.1061/(asce)co.1943-7862.0001144 | es_ES |
dc.description.references | Bageis, A. S., & Fortune, C. (2009). Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(1), 53-71. doi:10.1080/01446190802596220 | es_ES |
dc.description.references | Chua, D. K. H., & Li, D. (2000). Key Factors in Bid Reasoning Model. Journal of Construction Engineering and Management, 126(5), 349-357. doi:10.1061/(asce)0733-9364(2000)126:5(349) | es_ES |
dc.description.references | Courvoisier, D. S., Combescure, C., Agoritsas, T., Gayet-Ageron, A., & Perneger, T. V. (2011). Performance of logistic regression modeling: beyond the number of events per variable, the role of data structure. Journal of Clinical Epidemiology, 64(9), 993-1000. doi:10.1016/j.jclinepi.2010.11.012 | es_ES |
dc.description.references | Dzeng, R. J., & Wang, P. R. (2016). Educational Games on Procurement and Negotiation: Perspectives of Learning Effectiveness and Game Strategies. Journal of Professional Issues in Engineering Education and Practice, 142(3), 04016004. doi:10.1061/(asce)ei.1943-5541.0000280 | es_ES |
dc.description.references | Egemen, M., & Mohamed, A. N. (2005). Different approaches of clients and consultants to contractors’ qualification and selection. Journal of Civil Engineering and Management, 11(4), 267-276. doi:10.1080/13923730.2005.9636357 | es_ES |
dc.description.references | Egemen, M., & Mohamed, A. N. (2007). A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions. Building and Environment, 42(3), 1373-1385. doi:10.1016/j.buildenv.2005.11.016 | es_ES |
dc.description.references | El-Mashaleh, M. S. (2010). Decision to bid or not to bid: a data envelopment analysis approach. Canadian Journal of Civil Engineering, 37(1), 37-44. doi:10.1139/l09-119 | es_ES |
dc.description.references | Enshassi, A., Mohamed, S., & El Karriri, A. (2010). Factors affecting the bid/no bid decision in the Palestinian construction industry. Journal of Financial Management of Property and Construction, 15(2), 118-142. doi:10.1108/13664381011063421 | es_ES |
dc.description.references | Infrastructure Australia. 2016. Australian infrastructure plan. Australian Government, Infrastructure Australia, Canberra. | es_ES |
dc.description.references | Jarkas, A. M. (2013). Primary factors influencing bid mark‐up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(1), 53-75. doi:10.1108/13664381311305078 | es_ES |
dc.description.references | Leśniak, A., & Plebankiewicz, E. (2015). Modeling the Decision-Making Process Concerning Participation in Construction Bidding. Journal of Management in Engineering, 31(2), 04014032. doi:10.1061/(asce)me.1943-5479.0000237 | es_ES |
dc.description.references | Lin, C.-T., & Chen, Y.-T. (2004). Bid/no-bid decision-making – a fuzzy linguistic approach. International Journal of Project Management, 22(7), 585-593. doi:10.1016/j.ijproman.2004.01.005 | es_ES |
dc.description.references | Ling, F. Y. Y., William Ibbs, C., & Cuervo, J. C. (2005). Entry and business strategies used by international architectural, engineering and construction firms in China. Construction Management and Economics, 23(5), 509-520. doi:10.1080/01446190500040141 | es_ES |
dc.description.references | Lowe, D. J., & Parvar, J. (2004). A logistic regression approach to modelling the contractor’s decision to bid. Construction Management and Economics, 22(6), 643-653. doi:10.1080/01446190310001649056 | es_ES |
dc.description.references | Mosley, J. C., & Bubshait, A. A. (2016). Performance Evaluation of International Contractors in Saudi Arabia. Journal of Professional Issues in Engineering Education and Practice, 142(1), 04015007. doi:10.1061/(asce)ei.1943-5541.0000254 | es_ES |
dc.description.references | Oo, B., Drew, D. S., & Lo, H. P. (2007). Applying a random coefficients logistic model to contractors’ decision to bid. Construction Management and Economics, 25(4), 387-398. doi:10.1080/01446190600922552 | es_ES |
dc.description.references | Oo, B.-L., Drew, D. S., & Lo, H.-P. (2008). A comparison of contractors’ decision to bid behaviour according to different market environments. International Journal of Project Management, 26(4), 439-447. doi:10.1016/j.ijproman.2007.06.001 | es_ES |
dc.description.references | Peduzzi, P., Concato, J., Kemper, E., Holford, T. R., & Feinstein, A. R. (1996). A simulation study of the number of events per variable in logistic regression analysis. Journal of Clinical Epidemiology, 49(12), 1373-1379. doi:10.1016/s0895-4356(96)00236-3 | es_ES |
dc.description.references | Shan, M., Chan, A. P. C., Le, Y., Xia, B., & Hu, Y. (2015). Measuring Corruption in Public Construction Projects in China. Journal of Professional Issues in Engineering Education and Practice, 141(4), 05015001. doi:10.1061/(asce)ei.1943-5541.0000241 | es_ES |
dc.description.references | Shash, A. A. (1993). Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(2), 111-118. doi:10.1080/01446199300000004 | es_ES |
dc.description.references | Shokri-Ghasabeh, M., & Chileshe, N. (2016). Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(2), 127-157. doi:10.1108/ci-04-2015-0021 | es_ES |
dc.description.references | TIONG, R. L. K., & ALUM, J. (1997). Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(2), 83-94. doi:10.1108/eb021041 | es_ES |
dc.description.references | Wanous, M., Boussabaine, A. H., & Lewis, J. (2000). To bid or not to bid: a parametric solution. Construction Management and Economics, 18(4), 457-466. doi:10.1080/01446190050024879 | es_ES |
dc.description.references | Wanous, M., Boussabaine, H. A., & Lewis, J. (2003). A neural network bid/no bid model: the case for contractors in Syria. Construction Management and Economics, 21(7), 737-744. doi:10.1080/0144619032000093323 | es_ES |
dc.description.references | Watt, D. J., Kayis, B., & Willey, K. (2010). The relative importance of tender evaluation and contractor selection criteria. International Journal of Project Management, 28(1), 51-60. doi:10.1016/j.ijproman.2009.04.003 | es_ES |
dc.description.references | Ye, K., Shen, L., Xia, B., & Li, B. (2014). Key attributes underpinning different markup decision between public and private projects: A China study. International Journal of Project Management, 32(3), 461-472. doi:10.1016/j.ijproman.2013.06.001 | es_ES |