Akyol, S. D., & Baykasoğlu, A. (2016). A multiple-rule based constructive randomized search algorithm for solving assembly line worker assignment and balancing problem. Journal of Intelligent Manufacturing, 30(2), 557-573. doi:10.1007/s10845-016-1262-6
Akyol, S. D., & Baykasoğlu, A. (2016). ErgoALWABP: a multiple-rule based constructive randomized search algorithm for solving assembly line worker assignment and balancing problem under ergonomic risk factors. Journal of Intelligent Manufacturing, 30(1), 291-302. doi:10.1007/s10845-016-1246-6
Alavidoost, M. H., Babazadeh, H., & Sayyari, S. T. (2016). An interactive fuzzy programming approach for bi-objective straight and U-shaped assembly line balancing problem. Applied Soft Computing, 40, 221-235. doi:10.1016/j.asoc.2015.11.025
[+]
Akyol, S. D., & Baykasoğlu, A. (2016). A multiple-rule based constructive randomized search algorithm for solving assembly line worker assignment and balancing problem. Journal of Intelligent Manufacturing, 30(2), 557-573. doi:10.1007/s10845-016-1262-6
Akyol, S. D., & Baykasoğlu, A. (2016). ErgoALWABP: a multiple-rule based constructive randomized search algorithm for solving assembly line worker assignment and balancing problem under ergonomic risk factors. Journal of Intelligent Manufacturing, 30(1), 291-302. doi:10.1007/s10845-016-1246-6
Alavidoost, M. H., Babazadeh, H., & Sayyari, S. T. (2016). An interactive fuzzy programming approach for bi-objective straight and U-shaped assembly line balancing problem. Applied Soft Computing, 40, 221-235. doi:10.1016/j.asoc.2015.11.025
Alavidoost, M. H., Tarimoradi, M., & Zarandi, M. H. F. (2015). Fuzzy adaptive genetic algorithm for multi-objective assembly line balancing problems. Applied Soft Computing, 34, 655-677. doi:10.1016/j.asoc.2015.06.001
Araújo, F. F. B., Costa, A. M., & Miralles, C. (2012). Two extensions for the ALWABP: Parallel stations and collaborative approach. International Journal of Production Economics, 140(1), 483-495. doi:10.1016/j.ijpe.2012.06.032
Aryanezhad, M. B., Kheirkhah, A. S., Deljoo, V., & Mirzapour Al-e-hashem, S. M. J. (2008). Designing safe job rotation schedules based upon workers’ skills. The International Journal of Advanced Manufacturing Technology, 41(1-2), 193-199. doi:10.1007/s00170-008-1446-0
Avikal, S., Jain, R., Mishra, P. K., & Yadav, H. C. (2013). A heuristic approach for U-shaped assembly line balancing to improve labor productivity. Computers & Industrial Engineering, 64(4), 895-901. doi:10.1016/j.cie.2013.01.001
Battini, D., Calzavara, M., Otto, A., & Sgarbossa, F. (2016). The Integrated Assembly Line Balancing and Parts Feeding Problem with Ergonomics Considerations. IFAC-PapersOnLine, 49(12), 191-196. doi:10.1016/j.ifacol.2016.07.594
Battini, D., Faccio, M., Persona, A., & Sgarbossa, F. (2011). New methodological framework to improve productivity and ergonomics in assembly system design. International Journal of Industrial Ergonomics, 41(1), 30-42. doi:10.1016/j.ergon.2010.12.001
Bautista, J., Batalla-García, C., & Alfaro-Pozo, R. (2016). Models for assembly line balancing by temporal, spatial and ergonomic risk attributes. European Journal of Operational Research, 251(3), 814-829. doi:10.1016/j.ejor.2015.12.042
Baykasoglu, A. (2006). Multi-rule Multi-objective Simulated Annealing Algorithm for Straight and U Type Assembly Line Balancing Problems. Journal of Intelligent Manufacturing, 17(2), 217-232. doi:10.1007/s10845-005-6638-y
Baykasoğlu, A., Demirkol Akyol, S., & Demirkan, B. (2017). An Excel-based program to teach students quick ergonomic risk assessment techniques with an application to an assembly system. Computer Applications in Engineering Education, 25(3), 489-507. doi:10.1002/cae.21816
Baykasoglu, A., Tasan, S. O., Tasan, A. S., & Akyol, S. D. (2017). Modeling and solving assembly line design problems by considering human factors with a real-life application. Human Factors and Ergonomics in Manufacturing & Service Industries, 27(2), 96-115. doi:10.1002/hfm.20695
Blum, C., & Miralles, C. (2011). On solving the assembly line worker assignment and balancing problem via beam search. Computers & Operations Research, 38(1), 328-339. doi:10.1016/j.cor.2010.05.008
Borba, L., & Ritt, M. (2014). A heuristic and a branch-and-bound algorithm for the Assembly Line Worker Assignment and Balancing Problem. Computers & Operations Research, 45, 87-96. doi:10.1016/j.cor.2013.12.002
Bortolini, M., Faccio, M., Gamberi, M., & Pilati, F. (2017). Multi-objective assembly line balancing considering component picking and ergonomic risk. Computers & Industrial Engineering, 112, 348-367. doi:10.1016/j.cie.2017.08.029
Botti, L., Mora, C., & Regattieri, A. (2017). Integrating ergonomics and lean manufacturing principles in a hybrid assembly line. Computers & Industrial Engineering, 111, 481-491. doi:10.1016/j.cie.2017.05.011
Bukchin, Y., & Raviv, T. (2018). Constraint programming for solving various assembly line balancing problems. Omega, 78, 57-68. doi:10.1016/j.omega.2017.06.008
Costa, A. M., & Miralles, C. (2009). Job rotation in assembly lines employing disabled workers. International Journal of Production Economics, 120(2), 625-632. doi:10.1016/j.ijpe.2009.04.013
Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. (2002). A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation, 6(2), 182-197. doi:10.1109/4235.996017
Ding, J.-Y., Song, S., Gupta, J. N. D., Zhang, R., Chiong, R., & Wu, C. (2015). An improved iterated greedy algorithm with a Tabu-based reconstruction strategy for the no-wait flowshop scheduling problem. Applied Soft Computing, 30, 604-613. doi:10.1016/j.asoc.2015.02.006
Fattahi, A., Elaoud, S., Sadeqi Azer, E., & Turkay, M. (2013). A novel integer programming formulation with logic cuts for the U-shaped assembly line balancing problem. International Journal of Production Research, 52(5), 1318-1333. doi:10.1080/00207543.2013.832489
Grunert da Fonseca, V., Fonseca, C.M., Hall, A.O., 2001. Inferential performance assessment of stochastic optimisers and the attainment function. 1993, 213–225.
Guo, Z. X., Wong, W. K., Leung, S. Y. S., Fan, J. T., & Chan, S. F. (2008). A Genetic-Algorithm-Based Optimization Model for Solving the Flexible Assembly Line Balancing Problem With Work Sharing and Workstation Revisiting. IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews), 38(2), 218-228. doi:10.1109/tsmcc.2007.913912
Hatami, S., Ruiz, R., & Andrés-Romano, C. (2015). Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times. International Journal of Production Economics, 169, 76-88. doi:10.1016/j.ijpe.2015.07.027
Hazır, Ö., & Dolgui, A. (2015). A decomposition based solution algorithm for U-type assembly line balancing with interval data. Computers & Operations Research, 59, 126-131. doi:10.1016/j.cor.2015.01.010
Hignett, S., & McAtamney, L. (2000). Rapid Entire Body Assessment (REBA). Applied Ergonomics, 31(2), 201-205. doi:10.1016/s0003-6870(99)00039-3
HOFFMANN, T. R. (1990). Assembly line balancing: a set of challenging problems. International Journal of Production Research, 28(10), 1807-1815. doi:10.1080/00207549008942835
Karhu, O., Kansi, P., & Kuorinka, I. (1977). Correcting working postures in industry: A practical method for analysis. Applied Ergonomics, 8(4), 199-201. doi:10.1016/0003-6870(77)90164-8
Knowles, J.D., Thiele, L., Zitzler, E., 2006. A tutorial on the performance assessment of stochastic multiobjective optimizers. TIK-Report 214.
López-Ibáñez, M., Paquete, L., & Stützle, T. (2006). Hybrid Population-Based Algorithms for the Bi-Objective Quadratic Assignment Problem. Journal of Mathematical Modelling and Algorithms, 5(1), 111-137. doi:10.1007/s10852-005-9034-x
Li, M., Tang, Q., Zheng, Q., Xia, X., & Floudas, C. A. (2017). Rules-based heuristic approach for the U-shaped assembly line balancing problem. Applied Mathematical Modelling, 48, 423-439. doi:10.1016/j.apm.2016.12.031
Li, Z., Tang, Q., & Zhang, L. (2017). Two-sided assembly line balancing problem of type I: Improvements, a simple algorithm and a comprehensive study. Computers & Operations Research, 79, 78-93. doi:10.1016/j.cor.2016.10.006
Liles, D. H., Deivanayagam, S., Ayoub, M. M., & Mahajan, P. (1984). A Job Severity Index for the Evaluation and Control of Lifting Injury. Human Factors: The Journal of the Human Factors and Ergonomics Society, 26(6), 683-693. doi:10.1177/001872088402600608
McAtamney, L., & Nigel Corlett, E. (1993). RULA: a survey method for the investigation of work-related upper limb disorders. Applied Ergonomics, 24(2), 91-99. doi:10.1016/0003-6870(93)90080-s
Miltenburg, G. J., & Wijngaard, J. (1994). The U-line Line Balancing Problem. Management Science, 40(10), 1378-1388. doi:10.1287/mnsc.40.10.1378
Minella, G., Ruiz, R., & Ciavotta, M. (2011). Restarted Iterated Pareto Greedy algorithm for multi-objective flowshop scheduling problems. Computers & Operations Research, 38(11), 1521-1533. doi:10.1016/j.cor.2011.01.010
Miralles, C., García-Sabater, J. P., Andrés, C., & Cardós, M. (2008). Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled. Discrete Applied Mathematics, 156(3), 352-367. doi:10.1016/j.dam.2005.12.012
Moreira, M. C. O., Miralles, C., & Costa, A. M. (2015). Model and heuristics for the Assembly Line Worker Integration and Balancing Problem. Computers & Operations Research, 54, 64-73. doi:10.1016/j.cor.2014.08.021
Mutlu, Ö., Polat, O., & Supciller, A. A. (2013). An iterative genetic algorithm for the assembly line worker assignment and balancing problem of type-II. Computers & Operations Research, 40(1), 418-426. doi:10.1016/j.cor.2012.07.010
Nourmohammadi, A., Zandieh, M., & Tavakkoli-Moghaddam, R. (2013). An imperialist competitive algorithm for multi-objective U-type assembly line design. Journal of Computational Science, 4(5), 393-400. doi:10.1016/j.jocs.2012.09.001
OCCHIPINTI, E. (1998). OCRA: a concise index for the assessment of exposure to repetitive movements of the upper limbs. Ergonomics, 41(9), 1290-1311. doi:10.1080/001401398186315
Oksuz, M. K., Buyukozkan, K., & Satoglu, S. I. (2017). U-shaped assembly line worker assignment and balancing problem: A mathematical model and two meta-heuristics. Computers & Industrial Engineering, 112, 246-263. doi:10.1016/j.cie.2017.08.030
Otto, A., & Battaïa, O. (2017). Reducing physical ergonomic risks at assembly lines by line balancing and job rotation: A survey. Computers & Industrial Engineering, 111, 467-480. doi:10.1016/j.cie.2017.04.011
Otto, A., & Scholl, A. (2011). Incorporating ergonomic risks into assembly line balancing. European Journal of Operational Research, 212(2), 277-286. doi:10.1016/j.ejor.2011.01.056
Pan, Q.-K., & Ruiz, R. (2014). An effective iterated greedy algorithm for the mixed no-idle permutation flowshop scheduling problem. Omega, 44, 41-50. doi:10.1016/j.omega.2013.10.002
Pereira, J. (2018). The robust (minmax regret) assembly line worker assignment and balancing problem. Computers & Operations Research, 93, 27-40. doi:10.1016/j.cor.2018.01.009
Polat, O., Kalayci, C. B., Mutlu, Ö., & Gupta, S. M. (2015). A two-phase variable neighbourhood search algorithm for assembly line worker assignment and balancing problem type-II: an industrial case study. International Journal of Production Research, 54(3), 722-741. doi:10.1080/00207543.2015.1055344
Rabbani, M., Kazemi, S. M., & Manavizadeh, N. (2012). Mixed model U-line balancing type-1 problem: A new approach. Journal of Manufacturing Systems, 31(2), 131-138. doi:10.1016/j.jmsy.2012.02.002
Ramezanian, R., & Ezzatpanah, A. (2015). Modeling and solving multi-objective mixed-model assembly line balancing and worker assignment problem. Computers & Industrial Engineering, 87, 74-80. doi:10.1016/j.cie.2015.04.017
Ritt, M., Costa, A. M., & Miralles, C. (2015). The assembly line worker assignment and balancing problem with stochastic worker availability. International Journal of Production Research, 54(3), 907-922. doi:10.1080/00207543.2015.1108534
Şahin, M., & Kellegöz, T. (2017). An efficient grouping genetic algorithm for U-shaped assembly line balancing problems with maximizing production rate. Memetic Computing, 9(3), 213-229. doi:10.1007/s12293-017-0239-0
Schaub, K., Caragnano, G., Britzke, B., & Bruder, R. (2013). The European Assembly Worksheet. Theoretical Issues in Ergonomics Science, 14(6), 616-639. doi:10.1080/1463922x.2012.678283
Shin, W., & Park, M. (2017). Ergonomic interventions for prevention of work-related musculoskeletal disorders in a small manufacturing assembly line. International Journal of Occupational Safety and Ergonomics, 25(1), 110-122. doi:10.1080/10803548.2017.1373487
Sungur, B., & Yavuz, Y. (2015). Assembly line balancing with hierarchical worker assignment. Journal of Manufacturing Systems, 37, 290-298. doi:10.1016/j.jmsy.2014.08.004
Talbot, F. B., Patterson, J. H., & Gehrlein, W. V. (1986). A Comparative Evaluation of Heuristic Line Balancing Techniques. Management Science, 32(4), 430-454. doi:10.1287/mnsc.32.4.430
Tan, K. C., Yang, Y. J., & Goh, C. K. (2006). A distributed Cooperative coevolutionary algorithm for multiobjective optimization. IEEE Transactions on Evolutionary Computation, 10(5), 527-549. doi:10.1109/tevc.2005.860762
Tasgetiren, M. F., Kizilay, D., Pan, Q.-K., & Suganthan, P. N. (2017). Iterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterion. Computers & Operations Research, 77, 111-126. doi:10.1016/j.cor.2016.07.002
Tiacci, L., & Mimmi, M. (2018). Integrating ergonomic risks evaluation through OCRA index and balancing/sequencing decisions for mixed model stochastic asynchronous assembly lines. Omega, 78, 112-138. doi:10.1016/j.omega.2017.08.011
Vilà, M., & Pereira, J. (2014). A branch-and-bound algorithm for assembly line worker assignment and balancing problems. Computers & Operations Research, 44, 105-114. doi:10.1016/j.cor.2013.10.016
WATERS, T. R., PUTZ-ANDERSON, V., GARG, A., & FINE, L. J. (1993). Revised NIOSH equation for the design and evaluation of manual lifting tasks. Ergonomics, 36(7), 749-776. doi:10.1080/00140139308967940
Yorke, J., 2017. Henry Ford – Master of flow.
Zacharia, P. T., & Nearchou, A. C. (2016). A population-based algorithm for the bi-objective assembly line worker assignment and balancing problem. Engineering Applications of Artificial Intelligence, 49, 1-9. doi:10.1016/j.engappai.2015.11.007
Zaman, T., Paul, S. K., & Azeem, A. (2012). Sustainable operator assignment in an assembly line using genetic algorithm. International Journal of Production Research, 50(18), 5077-5084. doi:10.1080/00207543.2011.636764
[-]