Estudio de soluciones para aprovechamiento hidroeléctrico en el vertido del canal Tajo-Segura al embalse de Alarcón (T.M. de Belmontejo, Cuenca).

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Estudio de soluciones para aprovechamiento hidroeléctrico en el vertido del canal Tajo-Segura al embalse de Alarcón (T.M. de Belmontejo, Cuenca).

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Solera Solera, Abel es_ES
dc.contributor.author Soler Llopis, Andreu es_ES
dc.coverage.spatial east=-2.2921856053293332; north=39.792274989182154; name=Cam. de Belmontejo, 16111 Villaverde y Pasaconsol, Cuenca, Espanya es_ES
dc.date.accessioned 2021-11-10T19:24:18Z
dc.date.available 2021-11-10T19:24:18Z
dc.date.created 2021-09-28
dc.date.issued 2021-11-10 es_ES
dc.identifier.uri http://hdl.handle.net/10251/176804
dc.description.abstract [ES] El canal del ATS conduce un volumen anual de agua de hasta 600 hm3/año de máximo con un promedio de entre 300 y 400 hm3/año. Este trasvase pasa por el río Júcar vertiendo sus aguas en la cola del embalse de Alarcón, para después derivar aguas abajo de este. El canal al aproximarse al embalse de Alarcón desciende una altura de entre 30 y 50 metros mediante 2 rápidas que disipan la energía del agua debida al desnivel existente. En el conjunto de las dos rápidas se estima una energía promedio de 30 a 35 GWh/año. Disponiendo de datos históricos de caudales mensuales en el ATS para el estudio hidrológico. Se propone revisar un estudio de soluciones previo en que se consideren las siguientes alternativas: 1. Aprovechamiento hidroeléctrico fluyente de la 1ª rápida. 2. Aprovechamiento hidroeléctrico fluyente de la 2ª rápida. 3. Aprovechamiento fluyente para el conjunto de las dos rápidas. 4. Aprovechamiento de puntas para cada una de las 3 construcciones anteriores. A continuación se profundizará en el estudio de soluciones y desarrollo del diseño constructivo de la alternativa 2 ya que en esta se prevé sea la idónea por obtener el mayor salto con menor inversión. es_ES
dc.description.abstract [EN] The ATS canal carries an annual volume of water of up to 600 hm3 / year maximum, with an average of between 300 and 400 hm3 / year. This transfer passes through the Júcar river, pouring its waters into the tail of the Alarcón reservoir, and then diverting downstream from it. When approaching the Alarcón reservoir, the channel descends between 30 and 50 meters in height using 2 rapids that dissipate the energy of the water due to the unevenness. In the set of the two rapids, an average energy of 30 to 35 GWh / year is estimated. Having historical data on monthly flows in the ATS that can be considered for the hydraulic study. It is proposed to carry out a study of solutions that consider the following alternatives: 1. Construction of 2 flowing plants. One for each fast. 2. Construction of a single flowing plant that saves the two rapids. 3. Construction of a regulated plant for the two rapids. Finally, a constructive design of a power station will be developed in Rapid 2 of Alternative 1 since this is the biggest jump and will mean less construction volume. es_ES
dc.format.extent 187 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Aprovechamiento hidroeléctrico es_ES
dc.subject Canal es_ES
dc.subject Central hidroeléctrica es_ES
dc.subject Energías renovables es_ES
dc.subject Hydropower es_ES
dc.subject Channel es_ES
dc.subject Power station es_ES
dc.subject Renewable energy es_ES
dc.subject.classification INGENIERIA HIDRAULICA es_ES
dc.subject.other Máster Universitario en Ingeniería de Caminos, Canales y Puertos (Acceso desde Grado I. de Obras Públicas)-Màster Universitari en Enginyeria de Camins, Canals i Ports (accés des del Grau Eng. d'Obres Públiques) es_ES
dc.title Estudio de soluciones para aprovechamiento hidroeléctrico en el vertido del canal Tajo-Segura al embalse de Alarcón (T.M. de Belmontejo, Cuenca). es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos - Escola Tècnica Superior d'Enginyers de Camins, Canals i Ports es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería Hidráulica y Medio Ambiente - Departament d'Enginyeria Hidràulica i Medi Ambient es_ES
dc.contributor.affiliation Universitat Politècnica de València. Instituto Universitario de Ingeniería del Agua y del Medio Ambiente - Institut Universitari d'Enginyeria de l'Aigua i Medi Ambient es_ES
dc.description.bibliographicCitation Soler Llopis, A. (2021). Estudio de soluciones para aprovechamiento hidroeléctrico en el vertido del canal Tajo-Segura al embalse de Alarcón (T.M. de Belmontejo, Cuenca). Universitat Politècnica de València. http://hdl.handle.net/10251/176804 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\131001 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem