- -

Estudio básico de una pasarela peatonal sobre la autovía A-7, p.k. 326+900. T.M. de Paterna (Valencia).

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Estudio básico de una pasarela peatonal sobre la autovía A-7, p.k. 326+900. T.M. de Paterna (Valencia).

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Ferrer Pérez, Vicente Melchor es_ES
dc.contributor.author Campos Collados, Jorge es_ES
dc.coverage.spatial east=-0.47542736714846434; north=39.52147947920225; Autovía del Mediterráneo, Paterna, Valencia, Espanya es_ES
dc.date.accessioned 2022-02-01T09:44:16Z
dc.date.available 2022-02-01T09:44:16Z
dc.date.created 2021-12-22
dc.date.issued 2022-02-01 es_ES
dc.identifier.uri http://hdl.handle.net/10251/180418
dc.description.abstract [ES] DESCRIPCIÓN En este Trabajo Fin de Grado se estudiará la ejecución de una nueva pasarela para uso ciclopeatonal sobre la autovía A-7 a la altura del p.k. 326+900, en el término municipal de Paterna. La obra conectará el carril bici existente en la C/. 526 de la urbanización La Cañada con el también existente en la C/. Islas Canarias del Polígono Industrial Fuente del Jarro. La nueva pasarela permitirá la movilidad transversal para tráfico no motorizado sobre la A-7 dando continuidad a los carriles bici ya existentes a ambos lados de ese punto de cruce. ALCANCE En este estudio básico se definirá la geometría, viabilidad del proyecto y dimensionamiento general del mismo. Igualmente, se comprobará la compatibilidad con las futuras actuaciones de ampliación de la actual A-7 en ese tramo. Se realizará un estudio de alternativas previo y posterior predimensionamiento de la alternativa adoptada, añadiendo los cálculos pertinentes siguiendo la normativa actual, además del proceso constructivo y estudio de cimentaciones. Queda excluido de este estudio el diseño estructural de detalle de la pasarela y sus detalles constructivos específicos, el pliego de prescripciones técnicas particulares, presupuesto y resto de documentos objeto de un proyecto constructivo posterior. OBJETIVOS Los fines docentes que se pretende alcanzar con el trabajo se centran en que el alumno afronte, analice y resuelva una problemática técnica de una situación real mediante la aplicación de los conocimientos adquiridos a lo largo de sus estudios. PROPUESTA ÍNDICE Memoria y anejos a la memoria: - Memoria descriptiva - Anejos * Condicionantes * Topografía * Geología y geotecnia * Estudio de soluciones * Anejo de cálculo * Valoración económica * Programa de trabajos Planos PLAN DE TRABAJO El plan de trabajo contempla un total de 300 horas, que se dividen como sigue: - Búsqueda de antecedentes e información previa (30 horas). - Análisis de condicionantes (30 horas). - Encaje topográfico (20 horas). - Análisis geológico-geotécnico (20 horas). - Estudio de soluciones (50 horas). - Predimensionamiento y cálculo (60 horas). - Valoración económica y programa trabajos (20 horas) - Redacción de documentos (40 horas). - Diseño de planos (30 horas). MATERIAS RELACIONADAS - Mecánica - Análisis de Estructuras - Estructuras Metálicas - Estructuras Metálicas y Mixtas - Geotécnica y Cimientos - Instalación, Organización y Garantía de Calidad de Obras. es_ES
dc.description.abstract [EN] Description In this Final Degree Project, the execution of a new footbridge for cyclopeatonal use on the A-7 highway at the height of the p.k. 326 + 900, in the municipality of Paterna. The work will connect the existing bike lane in C /. 526 of the La Cañada urbanization with the one also existing in C /. Canary Islands of the Fuente del Jarro Industrial Estate. The new footbridge will allow transverse mobility for non-motorized traffic on the A-7, giving continuity to the existing bike lanes on both sides of this crossing point. SCOPE In this basic study the geometry, feasibility of the project and its general dimensioning will be defined. Likewise, compatibility with future expansion actions of the current A-7 in this section will be checked. A study of alternatives will be carried out prior to and subsequent pre-sizing of the adopted alternative, adding the pertinent calculations following the current regulations, in addition to the construction process and study of foundations. The detailed structural design of the walkway and its specific construction details, the specific technical specifications, budget and other documents that are the object of a subsequent construction project are excluded from this study. OBJECTIVES The educational purposes that the work is intended to achieve are focused on the student facing, analyzing and solving a technical problem in a real situation through the application of the knowledge acquired throughout their studies. PROPOSAL INDEX Memory and annexes to the memory - Descriptive memory - Annexes ¿ Conditioning factors ¿ Topography ¿ Geology and geotechnics ¿ Study of solutions ¿ Calculation annex ¿ Economic valuation ¿ Work program Plans WORKPLAN The work plan includes a total of 300 hours, which are divided as follows: - Background search and prior information (30 hours). - Analysis of conditioning factors (30 hours). - Topographic lace (20 hours). - Geological-geotechnical analysis (20 hours). - Study of solutions (50 hours). - Predimensioning and calculation (60 hours). - Economic valuation and work program (20 hours) - Drafting of documents (40 hours). - Design of plans (30 hours). RELATED SUBJECTS - Mechanics - Structures Analysis - Metallic structures - Metallic and Mixed Structures - Geotechnical and Foundations - Installation, Organization and Quality Assurance of Works. es_ES
dc.format.extent 149 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Estructura es_ES
dc.subject Acero es_ES
dc.subject Pasarela es_ES
dc.subject Ciclopeatonal es_ES
dc.subject Peatonal es_ES
dc.subject Ciclista es_ES
dc.subject Movilidad es_ES
dc.subject No motorizado es_ES
dc.subject A-7 es_ES
dc.subject Paterna es_ES
dc.subject Fuente del Jarro es_ES
dc.subject La Cañada es_ES
dc.subject Structure es_ES
dc.subject Steel es_ES
dc.subject Footbridge es_ES
dc.subject Cyclopedestrian es_ES
dc.subject Pedestrian es_ES
dc.subject Cyclist es_ES
dc.subject Mobility es_ES
dc.subject Non-motorized es_ES
dc.subject.classification INGENIERIA E INFRAESTRUCTURA DE LOS TRANSPORTES es_ES
dc.subject.other Grado en Ingeniería de Obras Públicas-Grau en Enginyeria d'Obres Públiques es_ES
dc.title Estudio básico de una pasarela peatonal sobre la autovía A-7, p.k. 326+900. T.M. de Paterna (Valencia). es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería e Infraestructura de los Transportes - Departament d'Enginyeria i Infraestructura dels Transports es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos - Escola Tècnica Superior d'Enginyers de Camins, Canals i Ports es_ES
dc.contributor.affiliation Universitat Politècnica de València. Instituto del Transporte y Territorio - Institut del Transport i Territori es_ES
dc.description.bibliographicCitation Campos Collados, J. (2021). Estudio básico de una pasarela peatonal sobre la autovía A-7, p.k. 326+900. T.M. de Paterna (Valencia). Universitat Politècnica de València. http://hdl.handle.net/10251/180418 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\142641 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem