- -

Optimización de la gestión del tiempo en el proyecto de rehabilitación del Castillo de Levallois-Perret, Francia

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Optimización de la gestión del tiempo en el proyecto de rehabilitación del Castillo de Levallois-Perret, Francia

Mostrar el registro sencillo del ítem

Ficheros en el ítem

dc.contributor.advisor Pellicer Armiñana, Teresa María es_ES
dc.contributor.author Gras, Eileen Michelle Marie es_ES
dc.coverage.spatial east=2.2802683684058467; north=48.89014266937952; name=48 Rue de Villiers, 92300 Levallois-Perret, França es_ES
dc.date.accessioned 2024-10-17T13:58:42Z
dc.date.available 2024-10-17T13:58:42Z
dc.date.created 2024-09-30
dc.date.issued 2024-10-17 es_ES
dc.identifier.uri http://hdl.handle.net/10251/210469
dc.description.abstract [ES] En el marco de mi doble titulación entre la ESTP PARIS, especialidad en Ingeniería Civil en Edificación, y la UPV, especialidad en Ingeniería de Caminos, Canales y Puertos, realicé mi Trabajo de Fin de Master en FAYAT BÂTIMENT Île-de-France, agencia y división del grupo FAYAT, la cuarta empresa francesa de construcción. Durante cuatro meses, participé en el proyecto del Castillo, una operación de rehabilitación del castillo de Levallois- Perret, al noroeste de París. Mi labor consistió en la optimización de la gestión del tiempo, en la fase de preparación de la obra y al inicio de su ejecución, en un contexto de plazos ajustados y en el marco de los Juegos Olímpicos y Paralímpicos de París 2024. Como Ingeniera de Obras COA, mi misión consistió en llevar a cabo la fase de preparación de la obra, desde la consulta hasta la preparación de los trabajos, con el principal objetivo de optimizar el tiempo: el reto primordial era satisfacer a nuestro cliente entregándole las llaves del edificio en la fecha acordada del 2 de enero de 2025. Para abordar esta problemática, primero tuve que familiarizarme con el proyecto y su expediente de licitación, con el fin de identificar las etapas críticas. Luego, tras haber identificado los márgenes de maniobra principales, pude concentrarme en el proceso de consulta de las empresas, para determinar cuáles serían nuestras colaboradoras en este proyecto. Este trabajo de investigación me permitió tener una mejor comprensión del funcionamiento de la obra y de identificar los puntos clave que requerían una atención especial en la planificación y la ejecución. Al final de mi estancia, tuve la oportunidad de asistir al inicio de la ejecución de los trabajos que me correspondían (los COA), lo que me permitió comprender mejor la realidad del terreno, particularmente en la rehabilitación, donde pueden surgir sorpresas detrás de cada capa de pintura. Durante estos cuatro meses, tuve que demostrar adaptación, ingenio y priorización de tareas. Descubrí la fase de preparación de la obra, sus actores y sus desafíos, y utilicé mis experiencias previas en obra, así como las enseñanzas recibidas en la UPV y la ESTP para llevar a cabo con éxito mi misión. es_ES
dc.description.abstract [EN] As part of my dual degree program between ESTP Paris, specializing in Civil Engineering in Building Construction, and UPV, specializing in Civil Engineering (Roads, Canals, and Ports), I completed my Master s Thesis at FAYAT BÂTIMENT Île-de-France, an agency and division of the FAYAT group, the fourth largest construction company in France. For four months, I participated in the Castillo project, a rehabilitation operation of the Levallois-Perret Castle, located northwest of Paris. My work focused on optimizing time management during the preparation phase and at the start of its execution, within the context of tight deadlines and in line with the Paris 2024 Olympic and Paralympic Games. As a Site Engineer (COA), my mission was to carry out the preparation phase of the project, from consultation to the preparation of works, with the main objective of optimizing time: the primary challenge was to satisfy our client by handing over the building s keys on the agreed date of January 2, 2025. To address this issue, I first had to familiarize myself with the project and its bidding dossier to identify critical stages. Then, after identifying the main maneuvering margins, I was able to focus on the consultation process with various companies to determine which ones would be our collaborators on this project. This research work allowed me to gain a better understanding of the operation of the site and to identify key points that required special attention in planning and execution. Towards the end of my internship, I had the opportunity to attend the beginning of the execution of the works that corresponded to my role (COA), which enabled me to better understand the reality on the ground, particularly in rehabilitation, where surprises can arise behind each layer of paint. During these four months, I had to demonstrate adaptability, ingenuity, and task prioritization. I discovered the construction preparation phase, its stakeholders, and its challenges, and I drew on my previous site experiences, as well as the lessons received at UPV and ESTP, to successfully carry out my mission. es_ES
dc.format.extent 84 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Optimización es_ES
dc.subject Plazos es_ES
dc.subject Consulta es_ES
dc.subject Cronograma es_ES
dc.subject Optimization es_ES
dc.subject Deadlines es_ES
dc.subject Consultations es_ES
dc.subject Timeline es_ES
dc.subject.classification INGENIERIA DE LA CONSTRUCCION es_ES
dc.subject.other Máster Universitario en Ingeniería de Caminos, Canales y Puertos-Màster Universitari en Enginyeria de Camins, Canals i Ports es_ES
dc.title Optimización de la gestión del tiempo en el proyecto de rehabilitación del Castillo de Levallois-Perret, Francia es_ES
dc.title.alternative Optimization of time management in the rehabilitation project of the Levallois-Perret Castle, France es_ES
dc.title.alternative Optimització de la gestió del temps en el projecte de rehabilitació del Castell de Levallois-Perret, França es_ES
dc.type Tesis de máster es_ES
dc.rights.accessRights Abierto es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos - Escola Tècnica Superior d'Enginyers de Camins, Canals i Ports es_ES
dc.description.bibliographicCitation Gras, EMM. (2024). Optimización de la gestión del tiempo en el proyecto de rehabilitación del Castillo de Levallois-Perret, Francia. Universitat Politècnica de València. http://hdl.handle.net/10251/210469 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\165926 es_ES


Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem