Forward Algorithm for the construction control of cable-stayed bridges built on temporary supports

RiuNet: Repositorio Institucional de la Universidad Politécnica de Valencia

Compartir/Enviar a

Citas

Estadísticas

  • Estadisticas de Uso

Forward Algorithm for the construction control of cable-stayed bridges built on temporary supports

Mostrar el registro completo del ítem

Lozano-Galant, JA.; Paya-Zaforteza, I.; Xu, D.; Turmo Coderque, J. (2012). Forward Algorithm for the construction control of cable-stayed bridges built on temporary supports. Engineering Structures. 40:119-130. doi:10.1016/j.engstruct.2012.02.022

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10251/46674

Ficheros en el ítem

Metadatos del ítem

Título: Forward Algorithm for the construction control of cable-stayed bridges built on temporary supports
Autor: Lozano-Galant, Jose A. Paya-Zaforteza, I. Xu, Dong Turmo Coderque, José
Entidad UPV: Universitat Politècnica de València. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil - Departament d'Enginyeria de la Construcció i de Projectes d'Enginyeria Civil
Universitat Politècnica de València. Instituto de Ciencia y Tecnología del Hormigón - Institut de Ciència i Tecnologia del Formigó
Fecha difusión:
Resumen:
Traditionally the construction process of cable-stayed bridges is modeled according to the backward approach, as its calculation is much easier using an elastic analysis. In this approach the bridge is disassembled according ...[+]
Palabras clave: Cable-stayed bridge , Construction control , Forward modeling , Iterative process , Temporary supports erection method , Construction process , Construction time , During construction , Elastic analysis , Erection techniques , Forward algorithms , Sequence of events , Structural elements , Temporary support , Time dependent phenomena , Trade off , Algorithms , Box girder bridges , Cable stayed bridges , Prestressing , Cables , Algorithm , Bridge , Construction method , Structural analysis
Derechos de uso: Cerrado
Fuente:
Engineering Structures. (issn: 0141-0296 )
DOI: 10.1016/j.engstruct.2012.02.022
Editorial:
Elsevier
Versión del editor: http://dx.doi.org/10.1016/j.engstruct.2012.02.022
Código del Proyecto:
info:eu-repo/grantAgreement/MICINN//BIA2009-13056/ES/Estudio Experimental Del Coeficiente De Rozamiento Entre Dovelas Prefabricadas De Hormigon Para Puentes Con Junta Seca Conjugada/
info:eu-repo/grantAgreement/Junta de Comunidades de Castilla-La Mancha//PII2I09-0129-4085/ES/Optimización Del Proceso De Tesado De Puentes Atirantados Construidos Con Tableros Apeados/
Agradecimientos:
Part of this work was done through a collaborative agreement between University of Castilla-La Mancha (Spain) and Tongji University (China). This included an exchange of faculty and scholars. The finantial support from ...[+]
Tipo: Artículo

recommendations

 

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro completo del ítem